Browse
Search
Agenda - 08-01-1989
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1989
>
Agenda - 08-01-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 5:05:14 PM
Creation date
3/10/2017 4:35:54 PM
Metadata
Fields
Template:
BOCC
Date
8/1/1989
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
495
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 67 <br /> h. Estimated traffic generated by the proposed development <br /> in trips per day (if it exceeds 800 trips per day, <br /> submit a traffic impact study in accordance with <br /> Article 13) . <br /> i. Front, side, and rear building setbacks as required by • <br /> Articles 5 and 6 of the Zoning Ordinance; <br /> j . Location of all proposed buildings and structures <br /> labeled according to floor area, building height and <br /> • function, and proposed finished floor elevation; <br /> • k. Vehicular use areas including existing and proposed <br /> streets and access drives, off street parking and <br /> loading to comply with Article 10 of the Zoning <br /> Ordinance, and entry/exit points of adjacent parcels; <br /> 1. Overhead and underground utilities with accompanying <br /> easements and storm drainage facilities/easements; <br /> (including septic tanks, wells, fire hydrants, <br /> irrigation, and security lights. ) <br /> m. Solid waste disposal facilities; <br /> n. All free-standing and wall-mounted signs in accordance <br /> with Article 9 of the Zoning Ordinance. <br /> o. A landscape plan demonstrating compliance with Article <br /> 12.3 of the Zoning Ordinance. <br /> p. Existing contour lines (dashed) and proposed contours <br /> (solid) at 5-foot intervals with 10-foot contours bold. <br /> Where site conditions warrant, 2-foot contours may be <br /> required; <br /> q. Retaining walls, tree wells, or rip rap as part of the <br /> grading plan; <br /> r. Streams, ponds, drainage ditches, swamps, floodway and <br /> floodplain boundaries; and <br /> s. Phase lines and numbers if the development is to be <br /> phased. <br /> Additional information may be required based on the site <br /> location and the type of development proposed. <br /> 14.3 SITE PLAN REVIEW: <br /> Upon submission, the Planning and Inspections Department will <br /> review the site plan application for completeness in form and <br /> content according to article 14.2. If an application is <br /> incomplete, it will be returned to the applicant within five <br />
The URL can be used to link to this page
Your browser does not support the video tag.