Browse
Search
Agenda - 06-28-1989
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1989
>
Agenda - 06-28-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 4:29:57 PM
Creation date
3/10/2017 4:03:18 PM
Metadata
Fields
Template:
BOCC
Date
6/28/1989
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change County JeaQtk Tepahtment <br /> Daniel B.Reimer,MPH,Director <br /> ENVIRONMENTAL HEALTH DIVISION .out at _ PERSONAL HEALTH DIVISION <br /> ANIMAL CONTROL DIVISION ft, DENTAL HEALTH DIVISION <br /> P.O.Box 8181,306C Revere R I VI P.O.Box 8181,300 W.Tryon SL <br /> tl. rorqw - <br /> Hillsborough,N.C.27278 Hillsborough.N.C.27278 <br /> HILLSBOROUGH CHAPEL HILL MEBANE DURHAM <br /> (919)732-8181 (919)967-9251 (919)227-2032 (919)668-7333 <br /> MEMORANDUM <br /> TO: EMILY CRUDUP <br /> FROM: RON HOLDWAY 12- <br /> DATE: JUNE 23, 1989 <br /> RE: SOTT.S INVESTIGATION AT MCCLENNON'S FARM <br /> This department has conducted soil evaluations on the site for the <br /> proposed McClennon's Farm project on Bowden Road (7.115..24) starting <br /> in 1987. Steve Steinbeck with the Division of Health Services also <br /> evaluated the site because of the size of proposed system. <br /> The site has been approved preliminarily for a system with a maximum <br /> daily design flow of 5880 gallons per day. The maximum loading rate <br /> or long term acceptance rate of the LPP field would be .1 gallons <br /> per day per square foot of field area. The total approved area <br /> identified by the field investigations was approximately 140,000 <br /> square feet. <br /> Before any permits could be issued by our department for the <br /> construction of the system, detailed engineering plans for the system <br /> would have to be submitted to our office and to DHS for, review and <br /> approval. <br /> I have asked for Mr. Steinbeck to foward a copy of his field report <br /> to us. I will deliver a copy of that report to you as soon as it <br /> is available. <br /> Please call if you have any questions concerning this matter. <br /> SOUTHERN ORANGE OFFICE: Carr Mill Mall, Suite 225, 100 N.Greensboro Si-, Carrboro,N.C.27510. (919)942-4168 <br /> • ----• <br />
The URL can be used to link to this page
Your browser does not support the video tag.