Browse
Search
Agenda - 06-28-1989
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1989
>
Agenda - 06-28-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 4:29:57 PM
Creation date
3/10/2017 4:03:18 PM
Metadata
Fields
Template:
BOCC
Date
6/28/1989
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1,1 <br /> 3 <br /> • <br /> • Two of the three land use approaches require the creation of a new <br /> program for the inspection and maintenance of structural stormwater BMPs <br /> -- both on-site and regional. Who will be responsible for planning and <br /> implementing this program? How will it be financed? <br /> • Will itublic water and sewer service be extended into the watershed? <br /> Under what conditions? Should clustering be allowed only where water and <br /> sewer service is available? <br /> • The Study recommends that reliance on alternative sewage treatment and <br /> disposal systems to serve clustered developments requires the creation of a <br /> new pr ram for some gmpection and maintenance„potentially <br /> including operation of such alternative systems. Who will develop and <br /> implement such a program? How will it be financed? <br /> • Is an overall joint watershed land use plan desired,as a basis for <br /> implementation of the study,and for the development of a regional BMP <br /> approach? Who will be responsible for the development of such a plan? <br /> • OWASA consumers are the principal beneficiaries of the Study's <br /> implementation. Should OWASA consumers be asked to bear some or all of <br /> the costs,associated with the Study's implementation? By what mechanism? <br /> • Is a phased approach to implementation desired? <br /> Finally,one or two of the group members have suggested that there may be some <br /> benefit in seeking an independent third-party facilitator to help the Work Group <br /> develop an agreement on the timing and specifics of actions to be taken by each <br /> jurisdiction. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.