Browse
Search
Agenda - 06-05-1989
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1989
>
Agenda - 06-05-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 4:05:29 PM
Creation date
3/10/2017 3:51:22 PM
Metadata
Fields
Template:
BOCC
Date
6/5/1989
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
----z--== <br /> - - <br /> 4 <br /> NT Land Surveys,Inc. <br /> 226 South Churton Street <br /> PJO°Box 1%6x <br /> Hillsborough, NC 27278 <br /> 1 May 1989 <br /> Ms. Mary Scearbo <br /> Orange County F'l anni no Dept . <br /> HiYlsborouoh , NC <br /> Dear Marv: <br /> On behalf c1i ents, Georae and Marcia Lattimore , I hereby <br /> request a revision of the phe.sino plan for Enc. River Estates, as <br /> shown on the enclosed revised Preliminary Plan . <br /> As you are aware , al l of the required d imr.-:rovertients -for Phases A • <br /> and B (with the exception of that portion of Lake Orange Road <br /> fronting lots 9 and 10) as shown on the original Preliminary Plan <br /> have been completed. <br /> At the time that the Final Plat for Phas-e One of this subdivision <br /> was submi tted and approved (May 1988) , the dec | si on was made to <br /> complete more than was required by the or ginal phasing plan with <br /> the expectation that sales • hrouoh the Sprino and Summer of 1988 <br /> would al low the completion of the entire oroject in only two <br /> phases. <br /> Immediately upon the recordation of the Final Plat -for Section <br /> One , a lawsuit was i led by an allacteci partner , and a l | en was <br /> placed on the property which prevented the marketing and sale <br /> of the lots. The l ien was not 1 fted until essentially al of <br /> the 1988 s*llino season had ended. <br /> The proposed new phasing schedule is as fol lows: <br /> Phase Two- Final Pl at approval in .December 1989 <br /> Phase Three- Final Plat approval in J une 1990 <br /> Thank yqu -for your consideration . <br /> SincereYy, <br /> Steve F. \'yha.sz <br /> . <br /> ` <br />
The URL can be used to link to this page
Your browser does not support the video tag.