Orange County NC Website
— i <br /> s . <br /> r _ <br /> ' 4 <br /> 3. The Administration of each jurisdiction is directed to <br /> prepare more detailed plans for this project, including <br /> identifying the exact. route, the amount and location of <br /> land and easements to be acquired, responsibility for <br /> acquiring, possible funding sources , and preparing a <br /> timetable for completion. <br /> 4. These plans are to be completed so that they can be <br /> included for consideration as early as the 1989-90 <br /> budget for each jurisdiction. <br /> -A <br /> Adopted: <br /> • <br /> • <br />