Orange County NC Website
• Environmental <br /> Assessment Checklist <br /> • konensird,pp 7) <br /> 1. Suly a clear,legible map of the proposed site and surrounding area.Mark area to be acquired and construction site. <br /> 2. Utilities <br /> Utilities to Serve Project \Projected Demand per Day Length of Lines to be Capacity of Lines EtwironmerstaBy Sensitive Area <br /> Constructed (inches diameter) to be Cut(for Utility acres, _ <br /> Electric • N/A <br /> Potable Water <br /> Ni A <br /> NO significant <br /> 1,r1crease 3300 8"/6" <br /> Sad Waste Disposal <br /> TVA <br /> Natural Gas N/A <br /> Water N/A <br /> 3. Land Alterations <br /> Alteration Present Use Previous Use Precent of <br /> (Planned use) (before change) (inunical) Acres Project Area <br /> To Se Acquired N/A . <br /> ot3e Developed N/A <br /> o Be Origin.*Cleated N/A • <br /> a Bs Landscaped N/A <br /> o Be Covered by Imam- <br /> .• Surtsce(square feet) N/A <br /> o Be Cut(cubic Yards) N/A <br /> o Be Red(cubic yards) <br /> V/A <br /> 4. Cultural Resources(archeological,historical,architectural) <br /> a)Please give any known archoelogical or historical,sites on project land: <br /> NONE. <br /> b)What kind,if any,site preparation has thready been conducted: <br /> c)Has area been previously surveyed by archeologist?If so,sive name of principal bleestiaatee and date of teeveY: <br /> d)0 YES 0 NO Are buidags/structures on site now?(abandoned barns,farmhouse,tabacoo sheds,bridges,etc.) <br /> ,1 <br /> e)Ages of wish bulding/stracture: <br /> • <br /> f)Will any of these structures be demolished?(indicate which): <br /> g)Will any of these structures be rehabilitated or renames&(Indicate which): <br /> 'h)Please include photographs of any buildings constructed prior to WWU if project activities include Rehabilitation,Acquisition, <br /> Clearance or Oemolition. <br /> 27 <br /> 1 <br />