Orange County NC Website
Assessment Checklist <br /> (continued.pegs$' <br /> Summary of Findings <br /> and Conclusions: <br /> The Rencher Street Community Revitalization Local Option Project <br /> will result in no long term adverse impact on the community. Sewer <br /> activities should only inconvenience residents temporarily. The <br /> long term benefits of these activities will offset any temporary <br /> inconveniences. <br /> Summary of - <br /> Environmental <br /> Conditions: <br /> The existing environmental conditions will not be adversely affected <br /> by project activities nor will the environment negatively impact <br /> • <br /> .ro 'ect activities. <br /> • <br /> • <br /> Project Modifications <br /> andAltunatilma <br /> Coma*tred <br /> Caution will be given to the handling of solid waste and lead base <br /> paint removal to ensure conformance with prescribed environmental <br /> precautions. • <br /> ..01.■■•■•=11/M■wr. miwoMelowlissolwOr <br /> • <br /> .ae•■■' <br /> ..•■•■■■•■■■■ <br /> 25 <br /> • <br />