Orange County NC Website
MATRIX CRITERIA <br /> • <br /> COMMUNITY CONCERNS <br /> (cont. ) <br /> LAND USE <br /> Site Compatibility with Existing Land Use: Least amount of <br /> non-compatible (acres) = 1 ; Most amount of non-compatible <br /> (acres) = O . <br /> Site Compatibility with Future Land Use: Least amount of <br /> non-compatible (acres) = 1; Most amount of non-compatible <br /> (acres) = O. <br /> Site Proximity to Compatible Land Use with Suitable <br /> Infrastructure for Economic Development: Adjacent = 1 ; <br /> Minus .2 per mile distance (negative values acceptable) . <br /> Subtotal 1S <br /> ACCESS <br /> Travel Time: 0-15 minutes = 1 ; 16-20 minutes = .8; <br /> 21-25 minutes = .i; 26-30 minutes = .2; > 30 minutes = O. <br /> Capacity of Road Network: ADT < 60% of design capacity 5 <br /> with year 2008 additional airport traffic; Yes = 1 ; <br /> No = O. <br /> Subtotal 10 <br /> Total SO <br /> • <br />