Orange County NC Website
2 <br /> construction of flow monitoring weirs downstream of Lake <br /> Orange, Corporation Lake and Lake Ben Johnson; the <br /> installation of water level gages at those lakes; and the <br /> installation of additional monitoring equipment at the <br /> existing stream flow monitoring station at Hillsborough. The <br /> financial plan consists of the County paying for the Lake <br /> Orange and Hillsborough monitoring station and construction <br /> equipment in total and advancing the funds for construction <br /> and equipment at Corporation Lake and Lake Ben Johnson. The <br /> advanced funds are to be paid back to the County by <br /> Hillsborough, Orange/Alamance and Piedmont Minerals over three <br /> years, in three equal yearly payments without interest <br /> charges, based on the proportion of the flow that each entity <br /> uses. <br /> AEpp ATIOM($) : Authorize the implementation of the construction and <br /> financial plan as presented. <br />