Orange County NC Website
3 <br /> .• • <br /> 3. The Administration of each jurisdiction is directed to <br /> prepare more detailed plans for this project, including <br /> identifying the exact route, the amount and location of <br /> land and easements to be acquired, responsibility for <br /> acquiring, possible funding sources , and preparing a <br /> timetable for completion. <br /> 4. These plans are to be completed so that they can be <br /> included for consideration as early as the 1989-90 <br /> budget for each jurisdiction. <br /> Adopted: <br /> • <br /> • <br />