Orange County NC Website
12 <br /> TABLE A-1 <br /> TRANSIT CAPITAL AND PLANNING ACTIVITIES <br /> FY 89-90 <br /> UMTA <br /> Project Description Local State Federal Funding Total <br /> 1 Transit Planning 8,535 8,534 68,276 Sec.9 85,345 <br /> 2 Associated Capital <br /> Maintenance Items 14,041 4,041 112,328 Sec.9 140,410 <br /> 3 Architect/Engineering <br /> Design: Southern Park <br /> and Ride 6,000 6,000 48,000 Sec.9 60,000 <br /> 4 Construction of <br /> Southern Park and <br /> Ride Facility 78,000* 78,000 624,000 Sec.9 780,000 <br /> 5 Purchase of <br /> Vehicles 275,040 275,040 2,200,320 Sec.9 2,750,400 <br /> I 6 Architect/Engineering <br /> Maintenance Expans. 6,000 6,000 48,000 Sec.9 60,000 <br /> 7 Transit Equipment: <br /> Operations 1,770 1,770 14,160 Sec.9 17,700 <br /> 8. Transit Equipment: <br /> Maintenance 700 700 5,600 Sec.9 7,000 <br /> 9. Maintenance Facility <br /> Renovation 400 400 3,200 Sec.9 4,000 <br /> TOTAL *390,486 390,485 3,123,884 3,904,855 <br /> *Total includes the value of the land used as local share. <br /> t <br />