Browse
Search
Agenda - 04-18-1989
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1989
>
Agenda - 04-18-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 2:17:41 PM
Creation date
3/10/2017 2:11:01 PM
Metadata
Fields
Template:
BOCC
Date
4/18/1989
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 If <br /> 6. Although small in comparison to Cane Creek Reservoir or other <br /> recent engineering marvels, the Sevenmil.e site will meet the needs <br /> of the upper Eno basin for many years to come. It will allow us to <br /> more than double the minimum flow in the Eno River during dry <br /> times, while providing a 20-year safe yield of 4.9 million gallons <br /> per day for consumptive use. Under all but the most frightening <br /> population projections, this would raise the available water supply <br /> in the basin to a level sufficient to meet the needs through the <br /> year 2025. <br /> //adtae. <br />
The URL can be used to link to this page
Your browser does not support the video tag.