Browse
Search
Agenda - 04-03-1989
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1989
>
Agenda - 04-03-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 1:57:04 PM
Creation date
3/10/2017 1:47:31 PM
Metadata
Fields
Template:
BOCC
Date
4/3/1989
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_, . _. • _ , .-.. <br /> File: 0-88-27 <br /> 3 <br /> NORTH CAROLINA STATE DEPARTMENT OF TRANSPORTATION <br /> DIVISION OF HIGHWAYS <br /> . • <br /> SECONDARY ROAD ADDITION INVESTIGATION REPORT <br /> ..i, <br /> . ' <br /> County Orange Co. File No. Date <br /> Township zaapea_aul______ Div. File No. • <br /> Local Name See Attached Sheet Subdivision Name Laurel Springs <br /> -.„Length See Attached <br /> 20 Ft, <br /> .Width Type 1-2 Condition Good <br /> Is this a subdivision street subject to the construction requirements for such <br /> streets? Yes Recorded See Attache cilOOkSee Atta. page See Attached <br /> Is this a subdivision street subject to participation paving? No <br /> Number of homes having entrances into road See Attached <br /> Other uses having entrances into road None <br /> Does right-of-way obtained meet present Division of Highways requirement? Yes <br /> If not, why? <br /> Is petition (SR-1) attached? Yes <br /> Is the County Commissioners' Approval (SR-2) attached? <br /> If not, why? <br /> Does the road meet present minimum Division of Highways construction requirements? <br /> Yes <br /> If not, state what is needed to place the road in an acceptable maintenance <br /> condition under Remarks and Recommendations. <br /> Is a map attached indicating information for reference in locating road by the <br /> Planning Department? Yes <br /> Cost to place in acceptable maintenance condition: Total Cost $ - 0 - <br /> Grade, drain, stabilize $ - , Drainage $ - , Other $ <br /> Remarks and Recommendations Section One of Laurel Springs Drive is the only <br /> access to SR 1104 for Quinn Court, Gibbon Drive, Valen Court and Oxford Court. <br /> This section will have an ADZ of 114. All other roads may stand alone. Recommend <br /> Addition. <br /> Reviewed and approved <br /> , - , <br /> I Board of Transportation Member • <br /> .. _ . • - .. . --57-6d. <br /> Reviewed and approved J. W. Watkins, P.E. E. M. Cowan <br /> DIVISION ENGINEER - . DISTRICT ENGINEER <br /> .....•••••••...... <br /> .............................................. ....... <br /> ..... ..........•....... .. <br /> . . <br /> -- _ _ _ .. . <br /> (Do not write in this space - <br /> • . . . <br /> • • • -- <br /> For use of-Secondary- Roads Dept.) <br /> . • • <br /> __ _ <br /> . <br /> Petition No. <br /> .. . <br /> . .. --. ., <br /> . . <br /> _ ... -_. <br /> • <br /> • <br /> (Do not write in this space - • <br /> For use of Planning Dept.) <br /> . • . <br /> .............. ..... ...... <br /> ...................................................... <br /> .........................0............. <br /> , . <br /> ■ Form SR-4 (7-77) <br /> 1 . . <br /> : - <br />
The URL can be used to link to this page
Your browser does not support the video tag.