Browse
Search
Agenda - 04-03-1989
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1989
>
Agenda - 04-03-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 1:57:04 PM
Creation date
3/10/2017 1:47:31 PM
Metadata
Fields
Template:
BOCC
Date
4/3/1989
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARmLE. F <br /> THE WORK OF THIS CONTRACT <br /> 1.1 The Contractor shall execute the entire Work described in the Contract Documents,except to the extent specifically indicated <br /> in the Contract Documents to be the responsibility of others.or as follows: <br /> • <br /> • <br /> 2 • <br /> • DATE OF OZWIMENCEIMENT cotwisnoN <br /> 2.1 The date of commencement is the date from which the Contract Time of Parsgraph 2.2 is measured,and shall be the date of this <br /> Agreement.as first written above,unless a different date is stared below or provision is made for the date to be fixed in a notice to pro- <br /> ceed issued by the Owner. <br /> (bum ow clay of cornnsesia+nwu.9 ie awn pun rtr day of this Ai rvenos or y-Rpeimbia is thstt the data did Wisest in a dodo to pretext) <br /> Notice to Phoee.ed date aha t pnevai t. <br /> Z.Z The Contractor shall achieve Substantial Completion of the entire Work not later titan <br /> (Insert the cateatker date or number Weede+wiao•dols alto die dry o�/ merit,tiro lucre aey tee AVOW Srd�ehUI Completion of tenets ten <br /> dons of the Work y not stated eisee bery in the CotefssKt OappMrttt.) <br /> 120 canaecutrive eatendan days 6ottowcng date (16 commencement as stated <br /> on the Notice to Pnoeeed. <br /> sublect to adlustments of this Contract Time as provided in the Contract Documents. <br /> throe pra+sex y any.for Nasadeod des aals ndattalt ro fadrry t droplet*o S ties) <br /> The Cont/tacton and the C4nt4actan.'a Suxety ahate be iiabt.e ion and ahaft pay the <br /> Oumen tiquidated damages in the arum 06 $100 pea day bon each catendan day o6 delay <br /> tuvt t the work tie 4ub4ta tint y compeete. <br /> ARTIaE 3 <br /> • <br /> • CONTRACT SUM <br /> • <br /> 3.1 The Owner shall pay the Contractor in current funds for the Contractor's perfomunce of the Contract the Contract Sum of <br /> Sixty Give thousand eight hundred batty Dollars <br /> 4 D 65 8ts0 .00 ), to addfliois and dultutions•: :provided in the Contract <br /> AIA OOCUEINT 1oi.ABBREVIATEDORINU.CONTRACTOR AGREEMENT•NEITH EDmON•AIA• •01967 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS. 1733 NEW YORK AVENUE.r&W.WASHINGTON.Q.C.20006 A1O7.193T 2 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.