Browse
Search
Agenda - 04-03-1989
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1989
>
Agenda - 04-03-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 1:57:04 PM
Creation date
3/10/2017 1:47:31 PM
Metadata
Fields
Template:
BOCC
Date
4/3/1989
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ARTICLE 1 /M <br /> • <br /> ' • - T ME WORK OF THIS CONTRACT <br /> t.i The Contractor shall execute the entire Work described in the Contract Documents.except to the extent specifically indicated <br /> in the Contract Documents to be the responsibility of others.or as follows: <br /> • <br /> • <br /> • <br /> ARTICLE 2 <br /> • <br /> DATE OF CONDLENCENENT AND SIAISTANriAL 002NILETION <br /> 2.1 The date of commencement is the date front which the Contract Time of Paragraph 2.2 is measured,and shall be the date of this <br /> Agreement.as first written above,unless a differ=date is stated below or provision is made for the date to be fixed in a notice to pro- <br /> ceed issued by the Owner. <br /> (Ger •or date M cent.911 Wpm from m•date a/ibis"8..—..-"d or.e applicable.stair ibis We dam wet tined is a*mot to pound/ <br /> Notice to Pn.oceed date sha& paevait. <br /> 2.2 The Contractor shall achieve Substantial Completion of the entire Work not later than <br /> insets the calendar date or number of cdsniw&w after the gate ol cow U,enrarrer+a•Also arson any rwptovnents for tartar Substanttat Comptesrort of certain pot. <br /> twos of the WWorrt of not stand Nuninry to the Carnes Oawawene:.) <br /> 120 con.becutive ca endwc days £ottotang date o4 commencement as stated <br /> on the. Notice to Proceed. <br /> .subject to adjustments of this Contract Time as provided in the Contract Documents. <br /> eat. <br /> - (irssert prortssons tf airy.for Ugridtorai Mo•eetts Mauna to ladtav to oavp Ita on ono.) <br /> The Contnactot and the Cantnacton's Surety shaft be tiabte £on and than pay the <br /> Owner tiquidated damages in the sum of $100 pet day lot each agendan day o f decay <br /> acacit the wank A ,ubstanvia.eby eomptete. <br /> ARTICLE 3, <br /> • <br /> • CONTRACT SUN • <br /> 3.1 The Owner shall pay the Contractor in current funds for the Contr actor's performance of the Contract the Contract Sum o <br /> i <br /> Sixty ive thousand eight hund'ted ion.ty deductions in the Contract <br /> and <br /> t <br /> s 65 840.00 )� subject <br /> to additions provided <br /> AlA OOCutil@rT A/m7•ADBR£v1A!D OWNR-CONTRACTOR AGREEMENT•Nam EDITION•AIA* •01987 Al�•1l1�7 <br /> THE AMERICAN INSTITUTE OP ARCHITECTS, 173S NEW YORK AVENUE.N.W.WASHINGTON,D.C.2000b <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.