Browse
Search
Agenda - 03-21-1989
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1989
>
Agenda - 03-21-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 12:25:30 PM
Creation date
3/10/2017 12:13:53 PM
Metadata
Fields
Template:
BOCC
Date
3/21/1989
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
It' <br /> 2 <br /> FEB 2 '7 1989 <br /> • TOWN OF CHAPEL HILL <br /> 306 NORTH COLUMBIA STREET <br /> CHAPEL HILL,NORTH CAROLINA 27516 <br /> Telephone(919)968-2700 <br /> To: Landfill Owner' s Group <br /> From: Bruce Heflin, Public Works Direct° , <br /> • Re : Responses to Questions and Comments fo, Last LOG Meeting <br /> Date: February 23, 1989 <br /> At the last LOG meeting, several questions regarding tipping <br /> fees , the landfill budget, and the recycling programs were <br /> raised. This is to respond to those questions . <br /> We have calculated tipping fees for FY 1989-90 based on a total <br /> revenue requirement of $1, 992, 500. This revenue requirement is <br /> $100 , 000 less than originally projected because- we plan to use <br /> excess revenues from tip fees from the present year to pay for <br /> part of the liner for the south side of Eubanks Rd. The <br /> contribution to the liner from the fee-based revenue was to be <br /> $300, 000. This has been reduced to $200,000 with addition of <br /> $100, 000 to come from the reserves . See attached memo and spread <br /> sheet from Randy Ballard for details . <br /> The budget includes costs' for the following: <br /> Landfill operations, personnel and equipment, <br /> General recycling program, <br /> Curbside recycling program, <br /> Engineering studies of options for waste volume reduction, <br /> Search for a new landfill site, <br /> A portion of the payment for a landfill liner for the south side <br /> of the present landfill, and <br /> Groundwater monitoring. <br /> In order to generate sufficient revenue to cover all costs , we <br /> have assumed that we will take in 116, 000 tons of solid waste. <br /> That is a net 4.52 increase, after recycling, over the 110, 000 <br /> tons we project for the current fiscal year. That waste will <br /> have the following composition based on data collected during <br /> 1988-891 <br /> General trash 752: 87 ,000 tons <br /> Construction wastes & bulky wastes e .g. brush 192 22, 000 tons <br /> Ash from the UNC Power Plant, 62 , 7, 000 tons <br /> See the attached spread sheet for cost and revenue details . <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.