Browse
Search
Agenda - 03-21-1989
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1989
>
Agenda - 03-21-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 12:25:30 PM
Creation date
3/10/2017 12:13:53 PM
Metadata
Fields
Template:
BOCC
Date
3/21/1989
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br /> The initial construction cost of a mess burn facility of this size, <br /> incorporating advanced pollution control technology, would be about $100 <br /> million (in 1988 dollars). This would require a bond issue of about $180 <br /> to $200 million. The tipping fee in the first year of facility operation <br /> would be about $70 per ton (in 1988 dollars) were the electricity produced <br /> to be sold to Duke Power Cdompany. Sale of energy to the Carolina Power and <br /> Light Cbmpany could reduce the first year tipping fee to around $65 per <br /> ton. On a net present value basis, the cost of a regional mess-burn <br /> facility expressed as a tipping fee would be in the $45 to $50 per ton <br /> range. This lower set of figures for the net present value is attributable <br /> to the offsetting revenues provided by the sale of energy over the 20 year <br /> period of project financing. <br /> Development of a regional, mass-burn waste-to-energy facility is expected <br /> to save the jurigdictions of both Counties about $30 million in initial <br /> construction costs and a total of about $70 million aver a 20 year period <br /> when compared to the cost of building and operating separate <br /> waste-to-energy facilities in each Ct*irity. This would translate into a <br /> savings of about $8 per ton of waste processed on a net present value <br /> basis. <br /> HER determined that a single, regional refuse derived fuel processing <br /> facility would be required to have an initial rated capacity of about 1400 <br /> tons per day and would require a site about 25 to 40 acres in size. The <br /> estimated construction costs for the facility would be about $45 million <br /> (in 1988 dollars) exclusive of the cost of land or modifications to any <br /> industrial or utility boilers and their associated pollution control <br /> ES - 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.