Orange County NC Website
• <br /> Task 7 - Scenic Road Standards and Policy <br /> The Engineer will review potential scenic roads in the County and, with input <br /> from County staff and local residents, will propose criteria for designating scenic <br /> roads in the County. The designation of scenic roads will rely heavily upon <br /> public input. The Engineer also will develop policies and programs for protecting <br /> the scenic appearance of such designated roads and bridges, in coordination with <br /> the Rural Character Study. <br /> Task 8 - Report and Presentations <br /> The Engineer will assemble the various elements of the transportation plan into a <br /> single, consistent report document, including both a technical report and an <br /> executive summary. Five report copies and one camera-ready original will be <br /> provided. The Engineer will present the report to the Planning Board and Board <br /> of Commissioners. <br /> Task 9--• Develop Design Standards <br /> The Engineer will recommend design standards for various types of <br /> thoroughfares. These will include typical cross section, design speed, and typical <br /> right-of-way requirements. <br /> Task 10 - Develop Implementation Plan _ <br /> The Engineer will develop an implementation program for public/private,road <br /> standards, upgrading unpaved secondary roads, and_recommendations concerning . <br /> implementation of the transportation element of the comprehensive plan. . <br /> This scope of service ihcrudes up to six•(6) meetings with the Transportation'.' : ., - . -•_ -Advisory Subcommittee. <br /> Services to be provided by County staff are shown in Exhibit C. • <br /> (A2) The schedule for the services listed above is agreed to be as follows: <br /> The Engineer will endeavor to complete those services described•under Phase,I -..•- "• . <br /> within a period of five (5) months from receipt of authorization•to proceed with • <br /> Phase T, and those services described under Phase II within a period of four (4) <br /> months from receipt of authorization to proceed with Phase II; however, this <br /> schedule will not apply to those portions of the Plan performed by outside <br /> consultants other than the Engineer. <br /> CD-Ill (01/88) 12 <br /> Ili . <br />