Orange County NC Website
the Project, including objectives and constraints, space, capacity• and performance <br /> expectations, flexibility and expandability, and any budgetary limitations; and furnish <br /> copies of all references or standards which the Client will require to be included in <br /> the Engineer's documents. • <br /> (c) Assist the Engineer by placing at its disposal all available information <br /> pertinent to the Project including previous reports and any other data relative to <br /> studies, design, construction, or operation of the Project, and provide those services <br /> described under Exhibit C. <br /> • (d) Furnish to the Engineer, as required for performance of the Engineer's <br /> Services (except to the extent provided otherwise in Exhibit A), the following: <br /> (i) data prepared by or services of others, including without limitation <br /> boring, probings and subsurface explorations, hydrographic surveys, laboratory <br /> tests and inspection of samples, materials and equipment; • <br /> • (ii) appropriate professional interpretations of and recommendations for all <br /> of the foregoing; <br /> (iii) environmental assessment and impact statements;- <br /> (iv) property, boundary, easement, right-of-way, topographic and utility - <br /> surveys; <br /> (v) _property descriptions; <br /> (vi) zoning, deed, and other land use restrictions; and • -•- • <br /> (vii) other special data-or consultations; all of which Engineer-may use•and-' -- <br /> rely upon in performing'Services underAhis:A-greement.!irrtt-- <br /> • (e) Arrange for access to and .make all provisions•for the Engineer to enter .• <br /> upon public and private property as required for. the Engineer' to perform services• • . - • <br /> under this Agreement. <br /> (f) Examine all studies, _.reports, sketches,_ proposals, and other documents . . <br /> presented by the Engineer, obtain advice.of an attorney,- insurance counselor and ....-_ - - <br /> other consultants as the.Client deems:appropriate-for:such. examination and:Tender'-in: •�.= <br /> writing decisions pertaining thereto within a reasonable time so as not to delay the <br /> _services of the Engineer. The Engineer shall have no liability to the Client for <br /> delays resulting from Client's failure to review documents.promptly. • <br /> (g) Furnish approvals and permits for all government authorities having <br /> jurisdiction over the Project and such approvals and consents from others as may be- • <br /> necessary for execution of the Project. <br /> CD-111 (01/88) 2 <br />