Orange County NC Website
KIMLEY-HORN AT 3001 WESTON TEL Na . 919 481 0062 Mar 16 ,89 15 :39 P. 13 <br /> I - ' <br /> Task 7 - Scenic 4.oad Standards and Pol'a % <br /> The Engineer will review potential scenic roads in the County and, with input <br /> from County staff and local residents, will propose criteria for designating scenic <br /> roads in the County. The designation of scenic roads will rely heavily upon <br /> public input. The Engineer also will develop policies and programs for protecting <br /> the scenic appearance of such designated roads and bridges, in coordination with <br /> the Rural Character Study. <br /> ask $ - Report and Presentaqpne <br /> The Engineer will assemble the various elements of the transportation plan into a <br /> single, consistent report document, including both a technical report and an <br /> executive summary. Five report copies and one camera-ready original will be <br /> provided. The Engineer will present the report to the Planning Board and Board <br /> of Commissioners. <br /> Dtk l vel+l 17aes' n�ards <br /> The Engineer will recommend design standards for various types of <br /> thoroughfares. These will include typical cross section, design speed, and typical <br /> right-of-way requirements. <br /> osk !0-- ? evelon ImniementatiotLPian <br /> The Engineer will develop an implementation program for public/private road <br /> standards, upgrading unpaved secondary roads. and recommendations concerning <br /> implementation of the transportation element of the comprehensive plan. <br /> This scope of service includes up to six (6) meetings with the Transportation <br /> Advisory Subcommittee. <br /> Services to be provided by County staff are shown in Exhibit C. <br /> (A2) The schedule for the services listed above is agreed to be as follows: <br /> The Engineer will endeavor to complete those services described under Phase I <br /> within a period of five(5) months from receipt of authorization to proceed with <br /> Phase 1, and those services described under Phase II within a period of four(4) <br /> months from receipt of authorization to proceed with Phase II; however, this <br /> schedule will not apply to those portions of the Plan performed by outside <br /> consultants other than the Engineer. <br /> CD-l11 (01/88) 12 - <br /> wor <br />