Browse
Search
Agenda - 03-13-1989
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1989
>
Agenda - 03-13-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 11:11:40 AM
Creation date
3/10/2017 11:04:30 AM
Metadata
Fields
Template:
BOCC
Date
3/8/1989
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 7 - Scenic Road Standards and Police <br /> The Engineer will review potential scenic roads in the County and, with input <br /> from County staff and local residents, will propose criteria for designating scenic <br /> roads in the County. The designation of scenic roads will rely heavily upon <br /> public input. The Engineer also will develop policies and programs for protecting <br /> the scenic appearance of such designated roads and bridges, in coordination with <br /> the Rural Character Study. <br /> Task 8 - Report and Presentations <br /> The Engineer will assemble the various elements of the transportation plan into a <br /> single, consistent report document, including both a technical report and an <br /> executive summary. Five report copies and one camera-ready original will be <br /> provided. The Engineer will present the report to the Planning Board and Board <br /> of Commissioners. <br /> Task 9 - Develop Design Standards <br /> The Engineer will recommend design standards for various types of <br /> thoroughfares. These will include typical cross section, design speed, and typical <br /> right-of-way requirements. <br /> Task JO - Develop Implementation Plan <br /> The Engineer will develop an implementation program for public/private road <br /> standards, upgrading unpaved secondary roads, and recommendations concerning <br /> implementation of the transportation element of the comprehensive plan. <br /> This scope of service includes up to six (6) meetings with the Transportation <br /> Advisory Subcommittee. <br /> Services to be provided by County staff are shown in Exhibit C. <br /> (A2) The schedule for the services listed above is agreed to be as follows: <br /> The Engineer will endeavor to complete those services described under Phase I <br /> • within a period of five (5) months from receipt of authorization to proceed with ' <br /> Phase I, and those services described under Phase II within a period of four (4) <br /> months from receipt of authorization to proceed with Phase II; however, this <br /> schedule will not apply to those portions of the Plan performed by outside <br /> consultants other than the Engineer. <br /> CD-111 (01/88) 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.