Orange County NC Website
25 <br /> Timeframe/ EDC <br /> Implementor Budget <br /> 1.0 Criteria for Target <br /> Selection/geographical EDC Target <br /> location. Selected targets and Advisory <br /> appropriate geographical locations Group to <br /> should include (but not be limited Complete <br /> to) recommendations from geographical area <br /> following: target lists by <br /> (Timescale and selection of targets April 1990, <br /> contingent upon cost/benefit <br /> analysis (1.8.1]) <br /> 1. Survey residents 13z township/ Private con- Budget <br /> geographical area. Conduct tractor or UNC request <br /> surveys area by area after FY <br /> "EDC Report to the People"(4.A) Complete at least 1989-90 <br /> and promotional video (2.C) two geographic $2,500 <br /> is available. (Coordinate with areas by December <br /> speakers bureau [4.B]) 1989, others by <br /> March, 1990 <br /> 2. Agricultural Targets - (See Request Agricultural <br /> 3.A, page 28) Extension to supply <br /> by October 1989 <br /> 3. Target, Retail and Services }For details see the <br /> (See 5.D, page 31) }the referenced pages <br /> }in this document <br /> 4. Tourist-related Targets <br /> (See 9.5, page 38) <br /> 5. Target Employers at Highly-skilled ) <br /> Professionals (See 11.5, <br /> page 42 and 2.5.6, page 27, re <br /> space for research-based business) ) <br /> MAR 8 <br />