Orange County NC Website
086 <br /> • <br /> defined by the N.C. Department of Transportation. As such, <br /> development pressures over the last 20 years have impacted <br /> and changed this interchange area from a rural residential <br /> sector to an evolving non-residential node. Another factor <br /> which will surely add to the changing climate in this <br /> vicinity is the future possibility of municipal water and <br /> sewer service from the City of Durham. As of this date, the <br /> City of Durham's corporate limit lies less than one and one- <br /> half miles from this area. This corridor is shown on the <br /> City's 2005 Comprehensive Plan as lying on the fringe of the <br /> City's Growth Boundary. <br /> b. To correct an error or omission in the Comprehensive <br /> Plan. <br /> At the time of the 1981 adoption of the Land Use Element of <br /> the Comprehensive Plan, a node was established at the <br /> intersection of Interstate 85 and U.S. 70. This node, the <br /> "Eno-2 Commercial/Industrial Node" was designated to <br /> accommodate non-residential development because of the <br /> strategic location of the intersection. Three quadrants of . <br /> the interchange were thus given the plan designation of 20- <br /> Year Transition Area with a Commercial/Industrial Transition <br /> Area overlay. The northeastern quadrant was not designated as <br /> either but left as Rural Residential. At the time of plan- <br /> ! related zoning changes in 1981, the area was inadvertently <br /> zoned GC-4, a zone that was consistent with the designation <br /> on the other surrounding areas - but inconsistent with a <br /> Rural Residential Area. <br /> The proposed amendment would rectify this situation by <br /> allowing this property to enter the plan designation of 20- <br /> Year Transition Area, a designation consistent with the <br /> surrounding area. In so doing, the GC-4 zoning for this <br /> property, which has been utilized in the interim period since <br /> 1981, would fit the Land Use Element. — <br /> 2. Article 2.2. 14.2 differentiates between, principal and <br /> secondary amendments to the Plan., <br /> As defined in this section, this proposed amendment <br /> would fall into the secondary amendment category. Subsection <br /> (b) states that "The expansion of a designated plan area <br /> where the additional area is contiguous to the existing plan <br /> designation and does not increase its land area by more than <br /> one hundred (100) acres" is to be considered a secondary <br /> amendment. <br /> As previously stated, at this interchange a substantial <br /> amount of land designated as 20-Year Transition exists within <br /> ,. Node". proposed for <br /> The area <br /> the "Eno-2 Commercial/Industrial Node T p p <br /> amendment is presently contiguous to this plan designation. <br /> The total acreage is 10.1 acres, well within the 100 acre <br />