Browse
Search
Agenda - 02-27-1989
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1989
>
Agenda - 02-27-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 11:33:05 AM
Creation date
3/10/2017 10:52:55 AM
Metadata
Fields
Template:
BOCC
Date
2/27/1989
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
083 <br /> 1981 Eno Township Plan. Page 3.10.16-17 of the Eno Township <br /> element describes the proposed distribution of Plan <br /> categories. The Eno-2 Commercial/Industrial Transition Area <br /> narrative contains the following statement in closing: <br /> 'New commercial and industrial uses should generally be <br /> confined to the areas south of the {Interstate 85 and U.S. <br /> 70} highways in order to reduce negative impacts on Eno River <br /> State Park. ' <br /> Given this specific statement, it is clear that the original <br /> intent of the Plan was to protect the environmentally- <br /> sensitive northeast quadrant of the node by discouraging <br /> intensive land uses. <br /> In this context, the proposed amendment does not meet the <br /> provisions set out in Article 20.3.2 which require a Plan <br /> amendment to carry out the intent and purpose of the <br /> Comprehensive Plan and should therefore be denied. <br /> 2) This amendment could have numerous potentially-adverse <br /> impacts on both the environmentally-sensitive Eno River State <br /> Park and an equally sensitive Natural Areas Site. The nature <br /> of both these sites require protection of the surrounding <br /> land use intensity - a process that this Plan amendment <br /> cannot ensure. <br /> 4IM 3) It is not clear that the provision of utility services <br /> from the City of Durham will reach far enough west to make <br /> service available to this site. The City's designated Future <br /> Growth Boundary is flexible as to interpretation and <br /> certainly subject to change. But the fact remains that a <br /> technical interpretation of the Durham Plan does not show the <br /> proposed amendment area as being within the Durham plan area. <br /> For these reasons, this amendment appears to be inconsistent <br /> with the. Plan in both intent and application. it is therefore <br /> recommended by staff that the amendment be denied. <br /> 411 <br />
The URL can be used to link to this page
Your browser does not support the video tag.