Browse
Search
Agenda - 01-30-1989
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1989
>
Agenda - 01-30-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 10:23:11 AM
Creation date
3/10/2017 10:20:55 AM
Metadata
Fields
Template:
BOCC
Date
1/3/1989
Meeting Type
Public Hearing
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Two reports, ancillary to the Phase I Study, were completed by <br /> Hazen and Sawyer in 1988. The first of these reports, completed <br /> in July, 1988, evaluated the technical and economic merits of <br /> proposal by the Town of Hillsborough to construct a roller <br /> ' compacted concrete dam and reservoir at Site D on seven Mile <br /> Creek. <br /> The second ancillary report, based on more accurate topographic <br /> data obtained by a new aerial survey, refined the numbers <br /> reflecting the construction costs, innundated area and impact on <br /> existing structures of the McGowan, Creek and the Seven Mile Creek <br /> Reservoirs. <br /> The three reports represent the County' s endeavor to date to - <br /> provide sufficient data on which a decision can be based for the <br /> selection of a site for a new Northern Orange County Raw Water <br /> Reservoir. According to the present time table the reservoir site will <br /> be selected by the Commissioners by the end of March. <br /> • <br /> • <br /> . • <br /> • <br /> • <br /> 4 - - • <br /> • <br /> U <br /> v7.;' <br />
The URL can be used to link to this page
Your browser does not support the video tag.