Browse
Search
Agenda - 01-03-1989
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1989
>
Agenda - 01-03-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 9:22:30 AM
Creation date
3/10/2017 8:51:54 AM
Metadata
Fields
Template:
BOCC
Date
1/3/1989
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 of 13 <br /> termination of the Agreement. <br /> Section 11. tSf_.N .... P----rldlrvlaintenarlsection. The Contractor shall maintain <br /> all project equipment at a high level of cleanliness, safety, and mechanical <br /> soundness. The Department shall conduct inspections, not less than once <br /> every two (2) years, to confirm proper maintenance pursuant to this Section <br /> and use compliance in accordance with Section 11 of this Agreement. The <br /> Contractor shall maintain all records of maintenance deemed necessary and <br /> appropriate by the Department until disposition of Project equipment. <br /> Section 12. Insurance. The Contractor shall be responsible for <br /> protecting the federal and state financial interests in project equipment <br /> purchased under this Agreement throughout the useful life of the equipment. <br /> The Contractor shall provide, on an annual basis and in such manner as the <br /> Department may require, written documentation that all equipment is insured <br /> against loss in an amount equal to or greater than ninety (90%) percent of <br /> the real value of the equipment. Failure of the Contractor to provide <br /> adequate insurance shall be considered a breach of contract and, after <br /> notification by the Department, may result in termination of this Agreement. <br /> Section 13. Useful Life of Project Equipment. "Useful life" for all <br /> Project equipment shall be determined by the Department. Upon the end of the <br /> period of useful life, the Contractor may dispose of Project equipment after <br /> notifying and receiving disposition instruction from the Department. <br /> Section 14. Disposition of Project The Contractor shall <br /> dispose of all project equipment in accordance with General Statutes <br /> 143-64.1 through 143-64.5. The Contractor shall remit to the Department a <br /> proportional amount of the fair market value of the project equipment, which <br /> shall be determined on the basis of the ratio of the financial assistance, <br /> both federal and State, provided by the Department to the actual acquisition <br />
The URL can be used to link to this page
Your browser does not support the video tag.