Browse
Search
Agenda - 01-03-1989
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1989
>
Agenda - 01-03-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 9:22:30 AM
Creation date
3/10/2017 8:51:54 AM
Metadata
Fields
Template:
BOCC
Date
1/3/1989
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> e. Application for amendment of an erosion control plan in <br /> written and/or graphic form may be made at any time under <br /> the same conditions as the original application. Until <br /> such time as said amendment is approved by the Erosion <br /> Control Officer, the land-disturbing activities shall not <br /> proceed except in accordance with the erosion control <br /> plan as originally approved. <br /> If the Erosion Control Officer, either upon review of the <br /> Erosion Control Plan or on inspection of the job site, <br /> determines that a significant risk of accelerated erosion <br /> or off-site sedimentation exists, revisions to the plan <br /> will be required. Pending the preparation of the revised <br /> plan, work shall cease or shall continue under conditions <br /> outlined by the Erosion Control Officer. <br /> • f. Erosion Control Plans shall be accompanied by an <br /> authorized statement of financial responsibility and <br /> ownership. This statement shall be signed by the person <br /> I i* financially responsible for the land-disturbing activity <br /> or his/her attorney-in-fact. The statement shall include <br /> the mailing and street addresses of the principal place <br /> of business of the person financially responsible and of <br /> the owner of the land or their registered agents. If ngt <br /> a resident, g . Carolina, the applicant must <br /> designate a North Carolina agent and include that agent's <br /> name and address j , Statement for the purpose of <br /> receiving notice of compliance or nowligaail1WANith. <br /> plan or this Ordinance. <br /> COMMENTARY: This change will be made in response to changes <br /> in State statutes. This change will be effective January 1, <br /> 1989. <br /> g. A copy of the approved Erosion Control Plan and any <br /> amendments and required revisions shall be kept on the <br /> job site at all times. <br /> Section 18.1 Erosion Control Standards <br /> A, Requirements, standards, and specifications for erosion <br /> control plans and erosion control techniques, meggarAEL <br /> and devices are contained in the "Orange County Soil <br /> Erosion and Sediment Control Manual." Copies of the <br /> Manual are available from the Erosion Control Division of <br /> thl Orange. County Planning Department. <br /> Corrections, revisions, and amendments, to the Soil <br /> Erosiaq and Sediment Control Manual shall be made upon <br /> recommendation of the Erosion Control Officer and <br /> approval by the Orange County Board• of Commissions <br /> COMMENTARY: The section above will be added to the <br />
The URL can be used to link to this page
Your browser does not support the video tag.