Orange County NC Website
. . • -. <br /> •23-Dec-88 <br /> PRELIMINARY COST ESTIMATE <br /> SEVEN MILE CREEK WITH EARTNFILL DAM <br /> NORMAL POOL USE 585.0 , SY-20 - 6 MGD ' <br /> IUNIT ITEM WORK QUANTITY I UNIT PRICE TOTAL <br /> =_~= LS 197,000 <br /> 1. Contractor Mobilization -- LS 50,000 <br /> a. Field office Expense <br /> 2. Dam site preparation AC 1100.00 44,000 <br /> a. Clearing and Grubbing 189100 CY 2.60 492,000 <br /> b. Stripping/Foundation Prep. LS -- 470,000 <br /> c. Surface and Subsurface Grouting <br /> 3. Dam Embankment 441000 CY 2.50 1,103,000 <br /> a. Random and 39200 CY 15.00 588,000 <br /> b. Sand and draedl nitter 41400 CY 25.00 1,035,000 <br /> d. 6" Dia.and Bedding 5000 LF 6.00 30,000 <br /> d. Pi Dim. Perforated Drain 28• EA 2500.00 70,000 <br /> e. Settlements 50 EA 200.00 10,000 <br /> f. Settlement Points <br /> 4. Principal Spillway 7210 CY 400.00 2,884,000 <br /> a. MaisfConcd tencrete 2020 CY 175.00 354,000 <br /> b. to Concrete Bedding 2400 CY 15.00 36,000 <br /> c. Stone -- LS -- 200,000 <br /> d. Ti own own Anchors -- LS 100,000 <br /> e. Miscellaneous Metal <br /> • 5. Diversion Conduit 490 LF 950.00 466,000 <br /> -- LS -- 1,050,000 <br /> 6. Intake <br /> Tower 2740 SF 40.00 110,000 <br /> a. Access Bridge <br /> 7. Access Roads --2600 LF 75.00 195,000 <br /> a. Drainage Ditches and Structures <br /> LS 150,000 <br /> 8. Miscellaneous Site Work 40 AC 1500.00 60,000• <br /> b. Fencing Clearing 2500 LF 15.00 38,000 <br /> b. Fencing 1 AC 3500.00 4,000 <br /> c. Concrete 3670 LF 25.00 92,000 <br /> e. Additional Class d. <br /> Concrete l Class ss B Concrete •- LS _- 20,000 <br /> 6000 CY 60.00 360,000 <br /> f. Erosion Control During Construction <br /> -- LS 100,000 <br /> 9. Electrical <br /> 10. Reservoir Clearing 390 AC 1000.00 390,000 <br /> 11. Property Acquisition 440 AC <br /> 2500.00 1,100,000 <br /> a. Property Not Including Structures 440 AC 2500.00 290,000 <br /> b. Mitigation Property LC -- 20,000 c. Buildings 1 1 <br /> d. Buildings in Critical Area 4 2 LS -- 120,000 <br /> 12. Road Relocations/Modifications <br /> -- LS -- 1,100,000 <br /> 13. Modifications to Existing Utilities <br /> -- LS <br /> 13,358,000 • <br /> Subtotal <br /> . 30% Engineering and Contingencies 4,007,000 <br /> 517,365,000 <br /> TOTAL BUDGET COST <br />