Browse
Search
Minutes 02-16-2017
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2017
>
Minutes 02-16-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 8:01:10 AM
Creation date
3/9/2017 7:58:38 AM
Metadata
Fields
Template:
BOCC
Date
2/16/2017
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Agenda - 02-16-2017 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2017\Agenda - 02-16-2017 - Work Session
Agenda - 02-16-2017 - 1 - Review and Amend the Orange County Housing Affordability Policy
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2017\Agenda - 02-16-2017 - Work Session
Agenda - 02-16-2017 - 2 - Solid Waste Five Year Financial Plan and Cost Study
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2017\Agenda - 02-16-2017 - Work Session
Agenda - 02-16-2017 - 3 - Bus Rapid Transit (BRT)-Light Rail Transit (LRT) Discussion
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2017\Agenda - 02-16-2017 - Work Session
Agenda - 02-16-2017 - 4 - County Commissioners – Boards and Commissions Assignments
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2017\Agenda - 02-16-2017 - Work Session
Agenda - 02-16-2017 - 5 - Discussion on Board Policies and Procedures
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2017\Agenda - 02-16-2017 - Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> • Operates mostly in dedicated bus lanes <br /> • Stop spacing: every 1/2 mile to every 1 mile <br /> • Articulated buses for busway-only service, 40-ft bus for buses that use part of busway <br /> • Avg speed at rush hour: -14 mph in recent USA installations <br /> Mode Profile: Light Rail Transit <br /> Where It Works: <br /> • Dedicated tracks in separate right-of-way or rail-only segment of major roadways <br /> • Demand for service every 5 to 15 minutes at rush hour <br /> • Trip intensities of 50-100+ trips/acre <br /> Operating Characteristics: <br /> • Operates on dedicated tracks out of traffic, limited lane sharing with buses/first <br /> responder vehicles <br /> • Stop spacing: every 1/2 mile to every 2 miles <br /> • 90-foot cars that can be joined together in trains <br /> • Avg speed at rush hour: -21 mph in recent USA installations <br /> Mode Profile: Commuter Rail <br /> Where It Works: <br /> • Only mainline railroad corridors <br /> • Demand for service every 20 to 60 minutes at rush hour, limited or no off-peak or <br /> weekend service <br /> • Serving long-haul trips for large regular workday employment market to dense job <br /> center in city CBD <br /> Operating Characteristics: <br /> • Shares tracks with freight, Amtrak trains <br /> • Stop spacing: every 2 miles to 5 miles <br /> • Typically 3 or more coach cars hauled by diesel locomotive <br /> • Avg speed at rush hour: 25-40 mph <br /> Measuring Trips Per Acre in Durham and Orange Counties <br /> Key To Travel Markets: Trip Intensity Map of Triangle (TJCOG) (graph) <br /> Trips Per Acre by Location (see map handout) <br /> D-O LRT Corridor Trips Per Acre, 2040 (graph) <br /> North Hills, Raleigh- Projected 2040 Trip Intensity: 75 trips/acre (graph) <br /> The Major Trip Generators in the Durham-Orange Corridor Are Strongly Related to Each <br /> Other <br /> Transit Onboard Survey, Durham & Orange Counties, 2014 (map) <br /> Transit Onboard Survey, Durham & Orange Counties, 2014 (map) <br /> Transit Onboard Survey, Durham & Orange Counties, 2014 (map) <br />
The URL can be used to link to this page
Your browser does not support the video tag.