Orange County NC Website
17 <br /> / Next Steps <br /> Relationship Between Plans <br /> Plans (chart) <br /> CTP Schedule <br /> Key Products - Highways <br /> Key Products - Highways <br /> Key Products — Public Transportation and Rail <br /> Key Products — Public Transportation and Rail <br /> Key Products — Bike, Pedestrian and Paths <br /> A Note on Adoption <br /> / The NCDOT Board of Transportation will adopt only the maps. The MPO Board may <br /> adopt the entire document. <br /> / The CTP replaces existing Thoroughfare Plans. <br /> / Any reference to Thoroughfare Plans in local ordinances may need to be changed. <br /> CTP vs. Thoroughfare Plans <br /> / Both Grant legal authority to reserve right-of-way <br /> / Both permit certain types of uses, e.g. industrial and allow speed humps, depending on <br /> the jurisdiction <br /> Local Thoroughfare Plans <br /> / Durham, 1992 <br /> / Chapel Hill, 1994 <br /> Carrboro, 1994 <br /> / Hillsborough, 1996 <br /> / Orange County, 1990 (not adopted) <br /> / Chatham County, 1983 <br /> Replace Thoroughfare Plans <br /> • CTP matches old Thoroughfare plans fairly well in terms of roadway type. <br /> ✓ MPO staff conducted multiple meetings with local staff to ensure comfortable <br /> with any roadway changes. <br /> • Local government reference to Thoroughfare: <br /> ■ Local staff are aware of any references to old T-fare Plan <br /> ■ Local staff will make any needed changes to local ordinance after CTP is <br /> adopted. <br /> Roadway Type (chart) <br /> Thoroughfare Plan vs. CTP (map) <br />