Orange County NC Website
DocuSign Envelope ID:09434BEC-1F7E-41E5-A9D1-4CA5D7ECE339 <br /> Secti��dnrm IF.uim 22 <br /> ualllui is <br /> ti L ns f III y Pers nrielll <br /> i,111114ti:11,K,„;hogt;1111111111 .01111)444;;i1, 9 Iltf.1111111 Andrew P. Mericie PE <br /> ,.�"���� � Project Engineer <br /> J �b <br /> Mr.Mericle is a Project Engineer in the Site Planning and Engineering Department in <br /> II.f; <br /> „ ", �� the Coats office. He has experience as a project engineer for site designs,stormwater <br /> 10 1011.111111, 1001� 1 ��'t'� o management designs,and public and private utility system designs. <br /> II f`i <br /> f ,p <br /> 1r �� Hare Valley Convenience Center,Northampton,VA: Project Engineer for the <br /> �� ��, , conceptual design and full site plan for a full service station including two roll-off <br /> bins, recycling,trash com actor,and oil dump station. <br /> r � �� p p <br /> Engineer Trash Convenience Centers(Two 5-acre sites),Northampton County,VA: Project <br /> 10 years with the firm engineer for the layout and design of general site and traffic flow plans. <br /> 10 years of experience <br /> Cheapside Convenience Center,Northampton,VA: Project Engineer for the <br /> Education conceptual design and feasibility study for three compact sites. <br /> • B.S./2006/Civil <br /> EngineeringNirginia Delstar Warehouse,Wilson County,NC: Project Engineer for a 150,000 SF <br /> Tech expansion including full fire access and fire infrastructure expansion along with a <br /> multi-bay loading dock and associated stormwater improvements. <br /> Professional <br /> Registration Durham Ultimate Storage,Durham,NC: Project Engineer for a 3-story 73,000 SF <br /> • Professional self-storage facility with bioretention and utility infrastructure. <br /> Engineer/2011NA <br /> Johnston Community College Parking Lot Renovation,Smithfield NC: Project <br /> Areas of Expertise Engineer. Bringing a mishmash of existing disheveled parking areas (gravel, <br /> • Commercial, dirt, and pavement) into an efficient set of lots while allowing for future utility <br /> residential, extensions and tractor trailer movements through a heavily congested area. <br /> governmental, and <br /> roadway construction NC Department of Revenue Bldg,Elizabeth City NC:A 6000sf office building <br /> drawings development with associated infrastructure on a very small sight while still <br /> • Drainage design providing tractor trailer access. <br /> • Site layouts <br /> • Grading and drainage Campbell Pointe Phase 1,2,3—Harnett County(Buies Creek) NC: Project <br /> • Site utilities Engineer for a 117-unit luxury townhome development adjacent to Campbell <br /> • Specification writing University. Designed in such a way that the rear phases could still be accessed and <br /> (Specslntact, Master built after Phase 1 was occupied with no construction interference.An NCDOT <br /> Spec) turnlane was also designed as part of this project. <br /> • Development <br /> standards (Unified <br /> Facility Criteria <br /> gaper Aden Acate <br /> n une riirg itf ue fn Enuiroi mczrtal Sei w tes" <br />