Browse
Search
2017-097-E SW - Draper Aden Associates, Inc. for engineering and environmental services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-097-E SW - Draper Aden Associates, Inc. for engineering and environmental services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2019 4:39:55 PM
Creation date
3/3/2017 3:36:04 PM
Metadata
Fields
Template:
Contract
Date
2/22/2017
Contract Starting Date
3/1/2017
Contract Ending Date
2/28/2022
Contract Document Type
Agreement - Services
Document Relationships
2018-210-E Solid Waste - Draper Aden Associations long term planning scope #3
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-624-E Solid Waste - Draper Aden amendment 2
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2019-252-E Solid Waste - Draper Aden environmental monitoring
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2017-097-E SW - Draper Aden Associates, Inc. for engineering and environmental services
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:09434BEC-1F7E-41E5-A9D1-4CA5D7ECE339 <br /> Secti��d n III°°' uuir 2 11 <br /> Qualific. ti L ns f III y I eirs uriirmelll <br /> yin L. Sadler <br /> ���,,, Field Services <br /> oh' ill mom jp, Mr.Sadler has utilized his multi-faceted experience on numerous Civil Engineering <br /> 11,0;110 10411111111111 Igo i 1 projects for counties, municipalities,and private enterprise. He has recently completed <br /> projects in Harnett,Johnston,Carteret, Craven,Catawba, and Madison Counties <br /> overseeing the construction administration of multiple construction projects for clients. <br /> Mr.Sadler has been responsible for the generation of multiple Preliminary Engineering <br /> , Reports and Environmental Assessments while assisting with the obtaining of grant <br /> funds for municipal utility and capital improvement projects. <br /> 7years with the firm Madison County Landfill Closure,Marshall,NC: Field Technician/Project <br /> 16 years of experience Manager. Performed QA services for the 14 acre closure including testing of <br /> structural fill, 18-inch clay cap,and 40-mil LLDPE geosynthetics. Generated final <br /> Education CQC documents. <br /> • B.S./2000/ Env <br /> Science Policy Stormwater Review Department,City of New Bern,NC: Member of Engineering <br /> and Admin/North team under contract with City of New Bern to review submitted Stormwater <br /> Carolina State Management and Nitrogen Removal Applications. <br /> University <br /> Lenoir County Landfill Phase 1 Expansion,LaGrange, NC: Field Technician/ <br /> Professional Project Manager. Performed contractor QC services for 10 acre new cell including <br /> Registration(s) testing of structural fill and 18-inch clay liner.Generated final CQC documents. <br /> • Manager of <br /> Landfill Operations Wayne County Landfill Phase 2 Expansion,Dudley,NC: Field Technician/Project <br /> Certification Manager. Performed contractor QC services for 20 acre new cell including testing <br /> #96545 (Solid Waste of structural fill and 24-inch clay liner.Generated final CQC documents. <br /> Association of North <br /> America) Catawba County Landfill Unit 2,Phase 2,Stage 2 Expansion,Newton, <br /> • American Concrete NC:Performed CQA services for landfill expansion. Responsibilities included <br /> Institute (ACI) Level 1 construction management and materials testing of this twenty-acre cell.The <br /> • Nuclear Radiation closure consisted of a 24-inch clay liner and a double 60-mil liner installation. <br /> Safety Training Contributed to final report. <br /> Areas of Expertise C.R.S.W.M.A.,Tuscarora Landfill,IRL Closure,New Bern,North Carolina:CQA <br /> • Regulatory Field Technician. Responsible for installation of a geosynthetic liner extension <br /> Compliance and construction of a clay liner berm. Liner extension consisted of a layer of <br /> • Engineering for Local geosynthetic clay liner, a 60-mil HDPE synthetic liner, and geocomposite drainage <br /> Government and layer. Responsible for the installation of geosynthetic cap (20 acres). Geosynthetic <br /> Industry cap consisted of a geosynthetic clay liner,a 30-mil LLDPE geosynthetic liner,a <br /> • Landfills,Transfer geocomposite drainage layer,and 18"of cover soil. <br /> Stations <br /> Draper Aden Associates <br /> Engtnee,mg. to t eyfn; • Enviranmezrtal Sei w tes" <br />
The URL can be used to link to this page
Your browser does not support the video tag.