Orange County NC Website
DocuSign Envelope ID:09434BEC-1F7E-41E5-A9D1-4CA5D7ECE339 <br /> sect n III°° uuir 1 <br /> Quail ns III y P ell^s nrmelll <br /> C. Tyrus Clayton, Jr.,Jrm PE <br /> ((f11➢1Drhn�iRrr�r�✓a auianvioU�, �* ���, �� ,�,a�„r� <br /> Client Manager <br /> yrr111�rrnrrr111f111/%1/„1� iW�r�ryifrrr�rou¢%/lli� <br /> Mr. Clayton has utilized his engineering expertise on a broad range of projects <br /> II 1.1010011.1 including design of residential single family and multifamily developments,municipal <br /> 11,11�� /�/, �� infrastructure,solid waste design,solid waste construction quality assurance, <br /> 111111111 0111 1.4 <br /> 1,01,11,1111,111 �� geotechnical investigations,stormwater management,site design,and construction <br /> administration. He has completed projects throughout North Carolina, Virginia,and <br /> 0��� - Tennessee and was responsible for directing numerous environmental,geotechnical, <br /> li and civil engineering projects for counties,municipalities,private enterprises,general <br /> contractors, and the North Carolina Division of Parks and Recreation. <br /> Project Manager <br /> 8 years with the firm Orange County Regional Landfill,Phase 4 Cell Construction,Chapel Hill, <br /> 18 years of experience NC: Provided QA/QC testing services for construction of new landfill cell. <br /> i Responsibilities included overseeing construction of a seven-acre cell with clay <br /> • B.S./1998/Civil liner,geosynthetic clay liner,60-mil HDPE synthetic liner, a geocomposite drainage <br /> Engineering/North layer,a leachate collection system and 18"cover soil. Produced final CQA report <br /> Carolina State that was submitted to NCDENR. <br /> University <br /> M.S./2000/Civil Blackburn MSW Landfill,Catawba County,NC: Project Manager. Provided <br /> • and Environmental CQA testing services and inspections for construction of new landfill cell. <br /> Engineering/North Responsibilities include overseeing of construction a fourteen-acre cell with clay <br /> Carolina State liner,a primary 60-mil HDPE synthetic liner,a secondary 60-mil HDPE synthetic <br /> University liner,a leachate collection system and a geocomposite/gravel drainage layer. <br /> Professional C.R.S.W.M.A., Newport Transfer Station,C&D Facility Addition,Newport, <br /> Registration(s) NC: Project Manager for the design and construction of Transfer Station addition <br /> • Professional to be utilized for transport of C& D waste. Responsible for the site design and <br /> Engineer/NC construction management.Construction management consisted of soil CQA and <br /> • Manager of concrete testing and construction documentation. <br /> Landfill Operations <br /> Certification (SWANA) Bryant LCID Landfill Expansion,Harnett County,NC: Project Manager/Project <br /> • Certified Stormwater Designer. Designed and permitted an approximate 10 acre expansion to the <br /> BMP Reviewer by NC existing LCID landfill. Permitting included E&S Control, Stormwater,and Solid <br /> State/NCDENR-DWQ Waste. <br /> Areas of Expertise Dunn/Erwin Landfill Gas Extraction System and Flare Station, Harnett County, <br /> • Solid Waste Facility NC: Project Manager. Providing operational assistance and system monitoring. <br /> Design <br /> • Permitting <br /> • Construction <br /> Administration <br /> Draper Aden Associates <br /> VZIP SurvevillQ Sei,w tes" <br />