Orange County NC Website
DocuSign Envelope ID:09434BEC-1F7E-41E5-A9D1-4CA5D7ECE339 <br /> Section ,,,I,,. , 1 11 <br /> • Regulatory reporting and representation <br /> • Wetland delineation and assessments relative to Phases 3 and 4 of the Expansion Area <br /> • Wetland delineation, permitting and mitigation activities <br /> • Stormwater benchmark monitoring, numeric effluent limitation monitoring,visual monitoring, <br /> comprehensive site evaluations, stormwater training,and non-stormwater discharge inspections <br /> P v <br /> i a County,Virgini <br /> Draper Aden Associates has served as the County's solid <br /> waste management consultant since 1984,through several <br /> procurement processes. Our scope of services has included: <br /> Landfill Engineering,General Consulting, Environmental r <br /> Services,Construction Services,and Planning Services. Projects . - ' ` <br /> have included (partial listing): <br /> tfc <br /> Engineering and Consulting <br /> • Planning assistance including County Solid Waste Management Plan <br /> • County-wide siting process for the new subtitle D landfill <br /> • Designed and permitting - Subtitle D landfill (Part A and Part B for Livingston LF #2) 1st municipally- <br /> owned double lined landfill in VA <br /> • Closure plans for four former landfill facilities <br /> • Variance for Chancellor LF #2 - 1st world-wide application of textured VLDPE; 1st alternate cap approved <br /> in Virginia <br /> • Construction documents, bidding, and award for: <br /> • Subtitle D disposal cells 1 through 5 <br /> • Closures of 4 landfills <br /> • Partial closure of Livingston LF #1 <br /> • Recreation park/closure for Chancellor LF #1;soccer&softball fields <br /> • Major convenience center at Chancellor, included entrance/scale improvements <br /> • Civil design and permitting of sludge/yard-waste composting facility <br /> Landfill Gas Services <br /> • Landfill gas monitoring,and landfill gas control <br /> • Successful funding via the economic stimulus program <br /> • Gas system planning and design, including the installation of recovery wells, header system,and 800 <br /> scfm blower flare station (BFS)for Livingston Landfill #2 <br /> • Construction documents and bidding services for phase 1 of gas collection system <br /> • Greenhouse Gas Reporting <br /> 0 <br /> Draper Aden Associates <br /> . / h'n,imrrii{, • Sm rrirrg • Ent'ilown,mai.)cri'icr. <br />