Browse
Search
Agenda - 01-24-2006-5p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 01-24-2006
>
Agenda - 01-24-2006-5p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:45:22 PM
Creation date
8/29/2008 9:03:21 AM
Metadata
Fields
Template:
BOCC
Date
1/24/2006
Document Type
Agenda
Agenda Item
5p
Document Relationships
2006 S Purchasing - Contract for Roof Asset Management Program Update
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2006
Minutes - 20060124
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Wayne Fenton O <br />Roof Condition Survey and Asset Management Program <br />MACTEC Proposal No 06RAIL.030 <br />January 19, 2006 <br />Page 3 <br />Assistance Requested of Orange County Public Works <br />We request your assistance in performing the requested services as follows: <br />Arranging for safe access to each roof by way of ladders, a roof hatch, or stairway. <br />I Arranging for access to the interior of each facility to allow examination of the underside <br />of the roof deck and observe for possible areas of leakage and water damage. <br />3. Providing copies of plans, specifications, reports, etc for our use in performing the <br />requested services. <br />4. Granting permission to take record photographs. <br />Granting permission to make and repair test cores. Please note that test cores involve <br />cutting through the membrane, insulation and vapor retarder down to the roof deck for <br />the purpose of extracting samples and making observations. We will make repairs using <br />generally accepted roofing materials and practices, however, clue to anticipated <br />deterioration and the otherwise unknown physical condition of existing materials, we <br />cannot assume responsibility for the watertight integrity of the roof system not any <br />resulting damages. Additionally, should a roof be under warranty please arrange for and <br />authorized roofing contractor to witness and repair the test cut or provide written <br />documentation to the effect that our actions will not invalidate the warranty <br />6. Advising us of your representative with whom we should contact with regard to <br />performance of the requested services. <br />Pees <br />We propose to charge for the services outlined herein a lump sum fee of $13,900. <br />Schedule <br />We propose to begin the requested services upon receiving your written authorization to proceed <br />and will complete the work within a mutually agreed upon time frame. <br />Authorization <br />Should you accept our proposal, please execute the attached Proposal/Work Acceptance Sheet <br />and return it to our office for countersigning, after which we will return it to you. To expedite <br />our commencement of this project, you may fax the signed proposal to us at (919) 831-8136. <br />Please note that our invoice is payable on receipt. <br />MACTEC Engineering mnl Consulting, Inc <br />3301 Atlantic Avenue. Raleigh. NC 27604 <br />919-876-0416 Fax; 919-831-8136
The URL can be used to link to this page
Your browser does not support the video tag.