Browse
Search
Minutes 01-27-2017
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2017
>
Minutes 01-27-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2017 11:17:09 AM
Creation date
2/22/2017 11:16:30 AM
Metadata
Fields
Template:
BOCC
Date
1/27/2017
Meeting Type
Work Session
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> Commissioner Price said there are efforts taking place at the state and national levels to <br /> give local governments authority to expand internet access into underserved areas. But they are <br /> not there yet. The N.C. Association of County Commissioners has been getting more support <br /> for its broadband initiatives because the rural counties are speaking up. If you add in the <br /> growing interest statewide in telehealth, internet-based education, workforce development, and <br /> economic development, then they are getting close to a winning coalition. At the national level, <br /> USDA has broadband grants for rural economic development. And NACo's leadership training <br /> is focused on seeing internet as a utility; those sessions included people from AT&T. <br /> Commissioner Burroughs said one thing the Board can do in the short run is to cost out <br /> what it would take to get more of the hotspots. <br /> Jim Northup said that the hotspots work only at locations receiving good, strong cell <br /> coverage from Verizon. They are being loaned to people who do not have internet, either <br /> because cable service is not available on their street or because they cannot afford it. The $480 <br /> annual cost per unit is paid by the County to Verizon. That cost already is negotiated through a <br /> State contract, so the County would not be able to reduce the cost by purchasing more units. <br /> The hotspot does a good penetration into areas that are not served by cable; about 4% of the <br /> County's geographic area does not have internet access, and the hotspots cover about 50% of <br /> that unserved area. <br /> Chair Dorosin said that as they think about using space on their cell towers as <br /> incentives, they could also be thinking about expanding cell service to underserved areas, and <br /> then extending the hotspots there. <br /> Jim Northup said, in reply to a question from Commissioner McKee, Verizon could at any <br /> time end the hotspot program. Once they negotiate the State contract they could pull the <br /> program. So it really is a Band-Aid approach. Hotspots are not a long term strategic solution. <br /> However, equipment failure is not a factor in our sustainability analysis. The contract requires <br /> Verizon to replace lost or broken units that have been in our possession for more than three <br /> months. There is no cost to the county. The range is like the wireless router in a home which is <br /> limited to about three rooms away. However, one could supplement a hotspot with a range <br /> extender. <br /> Commissioner McKee wondered whether power line towers and poles could be used in <br /> conjunction with repeaters or range extenders to serve a greater area than the hotspots alone. <br /> Jim Northup said that the electric utilities are trying to determine whether their <br /> easements would allow the placement of communications infrastructure. Hotspots are pretty <br /> much a household solution and not for a more extended range. <br /> Commissioner McKee said he was not hopeful about achieving local authority to do <br /> more from either Raleigh or Washington, D.C. <br /> Commissioner Rich said that decision makers in Raleigh and Washington will either <br /> have to provide a solution or admit that they do not want to supply broadband to rural residents. <br /> There are bills in Congress right now that will tie their hands further: they are about cell towers <br /> and who can use them. They need to be aware of this and she will distribute those bills to <br /> everyone. <br /> Example 3: Infrastructure <br /> The Manager presented on (a) the status quo, (b) anticipated forces of change and likely <br /> consequences, (c) how the County currently plans/prepares/provides for resilience in this <br /> context. <br /> Following a stretch break, Travis Myren presented on the status quo, forces of change, <br /> and resilience measures planned or being taken by the County with regard to infrastructure. <br /> Travis Myren made the following PowerPoint presentation: <br /> Infrastructure <br /> Status Quo <br />
The URL can be used to link to this page
Your browser does not support the video tag.