Browse
Search
Agenda - 01-24-2006-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 01-24-2006
>
Agenda - 01-24-2006-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2010 2:44:40 PM
Creation date
8/29/2008 9:02:36 AM
Metadata
Fields
Template:
BOCC
Date
1/24/2006
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20060124
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />Name: Joyce Wilson <br />Address: 105 Roberts Street <br />City: Carrboro <br />Phone #: 967-3720 <br />Date: 11/17/05 <br />Page 3 of 6 <br />Note: Prior to conducting Lead-Based Paint Abatement activities, all personnel <br />associated with the project should review and fully understand the requirements of <br />ALL applicable local, state, and federal regulations that may apply to the worksite. <br />1. WORKSITE PREPARATION <br />A. GROUND CONTAINMENT <br />L. Before exterior construction, construct a work site perimeter curb of <br />2x4 timbers ten (10) feet from the house exterior. Create an outer <br />barrier of flags and/or plastic tape three (3) feet on center and twenty <br />(20) feet from the worksite. Post proper signage in the work area. All <br />warning signs must remain posted until clearance is passed. <br />2. During the period of work on all exterior components attach one layer <br />of 6-mil polyethylene to the building exterior with furring strips, <br />extending the (10) feet past the work site. Wrap the plastic under the <br />perimeter 2x4's. Change the plastic daily. <br />B. CLEARANCE EXAMINATION <br />L After completion of all work that disturbed LBP and any other lead <br />hazard reduction activities, a qualified person shall perform a <br />clearance examination. Work disturbing lead-based paint is not <br />considered complete until clearance is achieved. <br />C. PRE-CLEAN <br />1. Pre-clean the interior of the unit in all areas that Lead Paint was <br />disturbed. IIEPA vacuum all horizontal surfaces, to include all floors, <br />windowsills, troughs, baseboards and casing. <br />$
The URL can be used to link to this page
Your browser does not support the video tag.