Browse
Search
Agenda - 01-24-2006-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 01-24-2006
>
Agenda - 01-24-2006-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2010 2:44:40 PM
Creation date
8/29/2008 9:02:36 AM
Metadata
Fields
Template:
BOCC
Date
1/24/2006
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20060124
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Joyce Wilson <br />Address: 105 Roberts Street <br />City: Carrboro <br />Phone #: 967-3720 <br />Date: 11/17/05 <br />Page 2 of 6 <br />This set of work specifications outlines work items that were found to contain lead in <br />concentrations above acceptable levels as set in the U. S. Department of Housing and Urban <br />Development (HUD) standards. It is recommended that any lead hazard remediation work be <br />conducted by workers who are certified by the state to perform lead abatement work. <br />Lead hazard remediation work must be preformed in compliance with the regulations issued <br />by the Secretary of Housing and Urban Development set forth in 24 CFR Part 35, et at and <br />all applicable rules and any others issued thereunder, and all applicable Federal, State and <br />local rules and regulations, regarding notification, evaluation and reduction of lead-based <br />paint hazards in residential structures undergoing Federally-assisted construction or <br />rehabilitation and require the elimination of lead-based paint hazards. Every contractor or <br />subcontractor, including painting, pursuant to which such Federally-assisted construction or <br />rehabilitation is performed, shall include appropriate provisions complying with requirements <br />for notification, evaluation and reduction of lead-based paint hazards. <br />The contractor shall be allowed to include in the cost of the project the allowable fee for one <br />(1) complete clearance inspection of the remediation work performed. The cost of any <br />additional clearance inspections which may be necessary will be born directly by the <br />contractor. <br />5 <br />Contractor must submit a copy of training certification with their bid.
The URL can be used to link to this page
Your browser does not support the video tag.