Browse
Search
Agenda - 01-24-2006-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 01-24-2006
>
Agenda - 01-24-2006-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2010 2:44:40 PM
Creation date
8/29/2008 9:02:36 AM
Metadata
Fields
Template:
BOCC
Date
1/24/2006
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20060124
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Joyce Wilson <br />Address; 105 Roberts Street <br />City: Carrboro <br />Phone #: 967-3720 <br />Date: 1 1/17/05 <br />II. KITCHEN <br />Page 10 of 12 <br />22 <br />1. Remove existing shoe mold and prepare existing floor and baseboard for <br />installation of new luaun plywood underlayrnent. Supply and install new <br />%4" luaun underlayment with a smooth top surface, and prepare for <br />installation of new vinyl floor cover. Supply and install new vinyl floor <br />cover per Owner selection. Includes caulking all seams at baseboard, new <br />shoe mold to match existing as close as practical, metal transition strips, <br />complete. <br />1 Remove existing damaged cabinet floor of sink cabinet and make repairs <br />to accommodate installation of new plywood floor. Supply and install <br />new '/4" plywood floor for cabinet, including seal all penetrations and <br />seams. Prime new material and provide latex semi-gloss painted finish, <br />complete. <br />III. HALL BATHROOM <br />Carefully remove existing crown molding and trim around shower <br />surround for later reinstallation. At existing walls above and to the sides <br />of shower surround, and at ceiling tluoughout Bathroom, supply and <br />install new 1/2" water resistant sheetrock, to be properly sealed so as to <br />prevent water and moisture leakage. Reinstall existing crown molding and <br />trim to match existing as close as practical. Sheetrock to have smooth <br />finish. All work to code <br />2. Repair existing strike plate for interior Bathroom/Bedroom door to restore <br />to proper working order. <br />3. Remove existing shoe mold and prepare existing floor and baseboard for <br />installation of new luaun plywood underlaynrent. Supply and install new <br />'/4' luaun underlayment with a smooth top surface, and prepare for <br />installation of new vinyl floor cover. Supply and install new vinyl floor <br />cover per Owner selection. Includes caulking all seams at baseboard, new <br />shoe mold to match existing as close as practical, metal transition strips, <br />complete.
The URL can be used to link to this page
Your browser does not support the video tag.