Browse
Search
Agenda - 01-24-2006-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 01-24-2006
>
Agenda - 01-24-2006-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2010 2:44:40 PM
Creation date
8/29/2008 9:02:36 AM
Metadata
Fields
Template:
BOCC
Date
1/24/2006
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20060124
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Joyce Wilson Page 9 of 12 <br />Address: 105 Roberts Street <br />City: Carrboro 21 <br />Phone #: 967-3720 <br />Date: 11/17/05 <br />K. GENERAL REPAIRS <br />1. Supply and install new metal corner trim pieces for metal siding where <br />original pieces are missing on right rear corner of house, and restore to <br />proper working order. <br />2. Remove damaged concrete and brick from left front corner of front porch <br />floor, and prepare area for installation of new replacement materials. <br />Supply and install new concrete underpinning and slab, and new brick <br />facing so as to repair failed corner. Includes proper tie-in to exiting <br />structure. New materials and finishes to match existing as close as <br />practical. <br />$ <br />1 Supply and install grout patching to crack in existing concrete front porch <br />slab. Finished surface to provide smooth transition between the separated <br />portions. New materials and finishes to match existing as close as <br />practical. <br />4. Provide temporary structural support and remove the two center wrought <br />iron columns in carport. Supply and install two new wrought iron <br />supports, properly anchored to existing concrete slab at base and properly <br />connected to structural beam at top, complete. <br />L. SITE IMPROVEMENTS <br />1. In the front yard, left side yard and rear yard, repair and modify existing <br />french drain system to restore to proper working order. Includes trenching <br />and installing drainpipe underground, with proper slope to drain away <br />from house, with direct tie-in from gutter downspouts. All drain pipe to <br />be solid flexible material. All terminations to be at least 10 IS down- <br />slope from house. All work complete.
The URL can be used to link to this page
Your browser does not support the video tag.