Browse
Search
Agenda - 01-24-2006-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 01-24-2006
>
Agenda - 01-24-2006-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2010 2:44:40 PM
Creation date
8/29/2008 9:02:36 AM
Metadata
Fields
Template:
BOCC
Date
1/24/2006
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20060124
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Joyce Wilson <br />Address: 105 Roberts Street <br />City: Carrboro <br />Phone #: 967-3720 <br />Date: 1 1/17/05 <br />Page 6 of 12 <br />18 <br />8, hi crawlspace/basement where partition walls are removed, properly <br />disconnect and secure existing electrical receptacles. At ceiling, repair <br />ceiling fixture to restore to proper working order, complete. <br />9. Properly disconnect existing electrical service to water beater at <br />splice. Supply and install new junction box and properly connect <br />electrical to restore to proper working order, complete. <br />10. Properly disconnect wiring at existing splice in crawlspace under Kitchen. <br />Supply and install new junction box and properly connect electrical to <br />restore to proper working order, complete. <br />11. Properly disconnect wiring at existing splice in crawlspace under <br />Bathroom. Supply and install new junction box and properly connect <br />electrical to restore to proper working order, complete. <br />12. Properly disconnect wiring at existing splice in crawlspace adjacent to <br />furnace. Supply and install new junction box and properly connect <br />electrical to restore to proper working order, complete. <br />11 Properly secure existing 220 electrical service to existing framing in <br />crawlspace under Laundry Area so it is not lying on the ground, complete. <br />$ <br />14. In crawlspace, supply and install wiring and outlet at furnace, <br />complete. <br /> <br />15. Supply and install new electrical to aecormnodate three new <br />light fixtures evenly distributed throughout crawlspace, including one <br />switch control located in crawlspace within 3 If. of access door. Supply <br />and install new fixtures, complete;
The URL can be used to link to this page
Your browser does not support the video tag.