Browse
Search
Agenda - 01-24-2006-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 01-24-2006
>
Agenda - 01-24-2006-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2010 2:44:40 PM
Creation date
8/29/2008 9:02:36 AM
Metadata
Fields
Template:
BOCC
Date
1/24/2006
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20060124
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Joyce Wilson <br />Address: 105 Roberts Street <br />City: Carrboro <br />Phone #: 967-3720 <br />Date: 1 1/17/05 <br />Page 4 of 12 <br />16 <br />practical. Supply and install new 25 year (minimum) composition shingle <br />roof cover over 15# felt, complete. All metal edge flashing, nosing and <br />drip edge to be pre-finished white material, Seal all connections to house <br />and all penetrations through roof with waterproof material. Shingles to <br />have 4" reveal. Style and color by owner. Contractor to supply owner <br />with written warranty for materials and labor. All work to code. <br />1 Supply and install new white pre-painted galvanized metal drip edge <br />flashings, new white pre-painted seamless Ogee style gutters on house, <br />porch and carport with at least one downspout for each gutter and one <br />downspout for every 30' of gutter. Includes supply and install new white <br />pre-painted metal diverter at bottom of right rear valley to divert water to <br />gutter system. Does not include removal of existing gutters and <br />downspouts (See Lead Remediation Specs). Color to match existing as <br />close as practical. Each grade level downspout from house shall tie in to <br />french drain system. <br />E. PLUMBING <br />1 Supply and install new shutoff valve on existing water service line in <br />crawlspace, complete. New shutoff valve to be located within 2 Lf. of <br />where service line enters crawlspace Valve location to have easy access <br />for Owner use. All work to code. <br />$ <br />2. In crawlspace, remove leaking galvanized pipe splice and connections <br />from existing PVC/cast iron drain line. Make repairs to provide uniform <br />connection of PVC and cast iron piping, including adequate slope for <br />drainage, to restore to proper working order. Work shall be performed in <br />an efficient, workmanlike manner so as to keep "down time" and <br />temporary connections to a minimum. All work to code. <br />.3, hi crawlspace, repair leaking water pipe at two locations under Kitchen to <br />restore to proper working order. Work shall be performed in an efficient, <br />worlananlike manner so as to ]seep "down time" and temporary <br />connections to a minimum. All work to code.
The URL can be used to link to this page
Your browser does not support the video tag.