Browse
Search
Agenda - 01-24-2006-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 01-24-2006
>
Agenda - 01-24-2006-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2010 2:44:40 PM
Creation date
8/29/2008 9:02:36 AM
Metadata
Fields
Template:
BOCC
Date
1/24/2006
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes - 20060124
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Joyce Wilson Page 2 of 12 <br />Address: 105 Roberts Street 14 <br />City: Carrboro <br />Phone #: 967-3720 <br />Date: 11/17/05 <br />I. MAJOR SYSTEMS <br />A. DEMOLITION <br />1. In crawlspace/basement of house, remove partition walls and paneling at <br />four walls, complete. Remove ceiling paneling to existing floor framing. <br />At same area, remove floor tiles, and leave area broom-clean. NOTE: <br />After partition walls and ceiling materials are removed, if further damage <br />is discovered the Owner, Contractor and Rehabilitation Specialist will <br />meet to review the work, determine a course of action and, if necessary, a <br />cost for any additional work, hl remainder of entire crawlspace, remove <br />all debris to a size large enough to be raked. <br />B. SUB-AREA CLEANUP & TERMITE REPORT/TREATMENT <br />I. Chemically treat entire perimeter of house for termite and pest control. <br />Chemical treatment to be done by a licensed termite or pest control <br />company. Contractor to provide owner with written proof and warranty of <br />treatment. <br />2. Supply and install 6-mil plastic vapor barrier throughout entire sub-area of <br />house so as to provide moisture protection. <br />C. FOUNDATION <br />1. In sub-area of house, provide temporary support adjacent to existing screw <br />jack/beam supports, and at two existing block/brick piers near left center <br />of house. Remove existing screw jack/beam supports and three wood <br />girders. Supply and install new concrete pads, new adjustable screw jacks, <br />and two new girders to stabilize existing floor. One new girder to be at <br />mid-span of floor joists under Living Room and approx. 16 H, The other <br />new girder to be within 1 I.f of the front foundation wall and approx 36 <br />l.f.. Remove two existing block/brick piers, level-off soil immediately <br />under piers and prepare these two areas for installation of new concrete <br />block piers. Supply and install two new concrete block piers at same <br />locations, including structural connections to existing floor framing. If <br />disconnection of existing plumbing, electrical or other utilities becomes
The URL can be used to link to this page
Your browser does not support the video tag.