Browse
Search
Agenda - 11-01-1993 - VIII-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 11-01-1993
>
Agenda - 11-01-1993 - VIII-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2017 3:21:15 PM
Creation date
2/14/2017 2:07:44 PM
Metadata
Fields
Template:
BOCC
Date
11/1/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br /> 3) Method B - Stream Buffer Based on Slope and Groundcover <br /> STREAM BUFFER WIDTH (IN FEET) <br /> BASED ON SLOPE AND GROUNDCOVER <br /> Slope Value Type of Groundcover <br /> Grass Woods <br /> 2 to 4.9 100 50 <br /> 5 to 9.9 150 100 <br /> 10 to 14.9 200 100 <br /> 15 or greater 250 150 <br /> 'In addition to the buffer zone resulting from the calculations below, a stream buffer shall <br /> include any portion of a floodplain as defined in the Orange County Flood Damage <br /> Prevention Ordinance, by special survey by a registered engineer or surveyor, or by <br /> alluvial soils as designated in the Orange County Soils Survey. <br /> 'Tile required stream buffer zone shall not be limited to one calculation, but shall be <br /> based on calculations made at points where topographical and ground cover conditions <br /> change based on an analysis of the site. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.