Browse
Search
Agenda - 11-01-1993 - VIII-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 11-01-1993
>
Agenda - 11-01-1993 - VIII-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2017 3:21:15 PM
Creation date
2/14/2017 2:07:44 PM
Metadata
Fields
Template:
BOCC
Date
11/1/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOV 15 '93 1.:,.34 CARREORO TOWN HALL P.6 <br /> PAGE 3 <br /> Orange County Requiat ions t 1116A A ac�ttne its <br /> 6.Operation&Maintenance <br /> Requirements for detention (structural <br /> BMP's)are provided for <br /> 7.Placement of Streets,Driveways, and <br /> Buildings <br /> Streets, driveways, & buildings should be <br /> situated to take advantage of the absorptive <br /> capacity of the soils & to avoid <br /> environmentally sensitive areas (stream <br /> buffers, wetlands, steep slopes >15%, it <br /> identified natural areas). Subdivision plats <br /> must show proposed building envelopes & <br /> approximate driveway locations. <br /> 8. Undisturbed Area <br /> CANE-CA (only): <br /> a) A minimum of the area necessary to <br /> meet impervious surface requirements <br /> shall remain undisturbed during the <br /> construction process <br /> b) the area to remain undisturbed shall <br /> include portions of the lot utilized for <br /> stormwater infiltration <br /> call clearing limits shaft be clearly marked <br /> &visible <br /> • 9.Stream Buffers <br /> a) CANE-CA. The buffer width shall be <br /> the width calculated using "Method A" <br /> which is "The width of the buffer shall be - <br /> (50) fifty feet twill the edge of the flood <br /> plain plus the slope value multiplied by <br /> four." <br /> b)CAIVE--PW The buffer width shall be • <br /> the width calculated using "Method A" or <br /> 150 feet whichever is less. <br /> 10) Water Supply / Sewage Disposal <br /> Facilities Allow the provision of water & waste <br /> New septic tanks &their nitrification fields water service only through individual on <br /> shall be located outside of any stream site wells & disposal systems; no <br /> buffers, or 100 feet from a perennial or municipal or community level waste water <br /> intermittent stream as shown on the USGS disposal. <br /> Quadrangle maps,whichever is further. Existing set back requirement of 300 feet <br /> 11) Clustering for septic systems& 150 feet for structures <br /> The number of lots cannot exceed the should remain in place for University Lake, <br /> number allowed by-the base zone & cannot Cane Creek, &their perennial streams. <br /> be less than 50%of the base lot size. <br />
The URL can be used to link to this page
Your browser does not support the video tag.