Browse
Search
Agenda - 11-01-1993 - VIII-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 11-01-1993
>
Agenda - 11-01-1993 - VIII-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2017 3:21:15 PM
Creation date
2/14/2017 2:07:44 PM
Metadata
Fields
Template:
BOCC
Date
11/1/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..,_ Huy 15 '9d 1,_i:d.d 1...1Hmmr ur-, i vvvi , , ,- <br /> `A <br /> PAGE 2 3,-..z <br /> Qran�un <br /> R ut ti C}L1VASA Comments, <br /> 4. 'Residential Density - Apply same restrictions used for University <br /> C�9 N Gt1 and E" ' di s are 1 Lake Watershed: 5 acre minimum lot size <br /> dwelling unit per 2 acres. plus strong protective measures; <br /> Interim emulations for the entire Cane <br /> 5. infiltration Systems Creek'W'atershed should require either:ms and ' <br /> ��,rmwattar infiltration systems a) a minimum 5 acre lot, size, with --- - - <br /> - <br /> detention facilities are proposed for filter the imperviousness - determined --b�the- <br /> t <br /> types:1/2" of stormwater and are of two proposed sliding scale,or <br /> types: b) a uniform impervious surface limit of <br /> a)�lon-structural starmwater control: 6°%o regardless of lot size. <br /> I)on-site control through the use of <br /> impervious surface ratios; <br /> 2)aff-site control through the use of <br /> dedicated infiltration areas. <br /> b)Structural controls (detention ponds or <br /> 11114Vs) may be required where non- <br /> structural methods do of starntwa#sr _ <br /> control the fast 1/2 <br /> runoff. <br /> G)I 1)res den surface limits: <br /> �n regulatis for the a Cam <br /> I)residenttad tale for Creek Watershed with a S acre lot size <br /> /�+,( V�jT yam.& impervious s sliding scale, or a uniform impervious'oas surface surface limit of 6% <br /> 2pt.4 NEid d °6, The allowance of up to 70% impervious <br /> (,;A11rE-C4 rip to 6% pervious coverage on 5% of the Cane Creek PW <br /> surface without Slto 2 ° SMP's area should be deleted from the County's <br /> 6%to 24%with <br /> CANE-PW up to 70% with proposal.evelvpmeztt in the Cane Creek <br /> BMI�'s (after new ton-residential Watershed should be subject to the same <br /> --_ development with impervious surface regardless of the - <br /> greater strict impervious limits regar <br /> greater than 12%occurs on 5%of the residential or.non-residential nature of the - <br /> watershed, impervious surface �Y project. <br /> subsequent development may flat <br /> exceed 30%, and BNIP's will- <br /> required when impervious surface <br /> exceeds 12%.) <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.