Orange County NC Website
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: June 26, 2007 <br />Acfiion Agenda <br />Item No. ~ <br />SUBJECT: Central Recreation Restroom and Accessibility Renovations <br />DEPARTMENT: Purchasing PUBLIC HEARING: (Y/N) No <br />Recreation <br />Public Works <br />ATTACHMENT(S): INFORMATION CONTACT: <br />Central Recreation Restroom and Pam Jones, 245-2652 <br />Accessibility Renovation Bid Tabulations Lori Taft, 245-2663 <br />Wilbert McAdoo, 245-2625 <br />Wayne Fenton, 245-2628 <br />PURPOSE: To authorize a contract for completion of the Central Recreation restroom <br />renovations and accessibility elements. <br />BACKGROUND: The existing restrooms, including fixtures, water and wastewater lines and <br />surfaces are believed to be largely original to the building (circa 1957). The existing <br />configuration does not meet the Americans with Disabilities Act (ADA) code requirements for <br />accessibility. In addition, water and wastewater plumbing lines, which are approximately 50 <br />years old are subject to leaks and failures, which could result in lost water resources, increased <br />cost to the County and inconvenience to customers. <br />The Board previously authorized a contract with Reece, Noland & McElrath, Inc. for design work <br />for replacement of restroom fixtures, water and waste water lines, and all surface treatments <br />(floors, walls, ceilings), including identification of water conserving measures and fixtures. The <br />scope of work was modified to include design for accessibility elements (exterior ramp, power <br />assisted door openers, etc.). Competitive bids were solicited during May 2007 for completion of <br />the restroom renovations and accessibility elements, closing on June 8, 2007. <br />Bids were solicited from contractors and apre-bid conference was attended by three <br />contractors. Four contractors answered the bid call. The lowest responsible bid that was <br />responsive for the restroom improvements and accessibility elements was received from HF <br />Mitchell Construction in the amount of $232,700 for restroom renovations and $17,153 for the <br />accessibility related work, for a total cost of $249,853. <br />FINANCIAL IMPACT: In fiscal year 2004-05, the Board approved $690,000 in 2004 Two-Thirds <br />Net Debt Funds for repairs to Central Recreation. Examples of major pieces of that project <br />included replacing the windows in the gymnasium along with up-fitting the restrooms throughout <br />the Central Recreation Facility. Adequate funding is available for completion of the restroom <br />and accessibility renovations as specified. <br />