Browse
Search
Agenda - 11-01-1993 - VII-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 11-01-1993
>
Agenda - 11-01-1993 - VII-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2017 3:09:07 PM
Creation date
2/14/2017 2:05:39 PM
Metadata
Fields
Template:
BOCC
Date
11/1/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VII-A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Received FTA Fixed Guideway Study Planning Grant <br /> During late 1992, the TTA received and executed federal and state <br /> transportation planning grant contracts. The $937,500 project will permit <br /> the Triangle area to evaluate fixed guideway options as well as to assist in <br /> the development of a new regional transportation model capable of <br /> predicting person trips and evaluating land use and transportation options. <br /> • Selected Fixed Guideway Transportation Consultants <br /> With selection teams comprised of Triangle area transportation, land use <br /> and economic development planners, the TTA received proposals from <br /> twelve consulting teams. Following competitive review by the selection <br /> team, the TTA Board of Trustees awarded the consultant contracts to <br /> Parsons, Brinkerhoff, Quade and Douglas, for the transportation and land <br /> use components, and to Hammer Siler George with Research Triangle <br /> Institute for the economic futures study. <br /> • Completed Phase I of Fixed Guideway Study <br /> In March 1993, this first phase of the Triangle Fixed Guideway Study was <br /> completed. The first phase gathered land use and transportation data, <br /> completed the study design, and determined the transportation modeling <br /> and public involvement aspects of the study. The second phase of building <br /> the evaluation tools and developing the future growth forecasts was started <br /> in May 1993, and is scheduled for completion in December 1993. <br /> • Began Development of Regional Travel Forecast Model <br /> For the Triangle Fixed Guideway Study and the long range regional travel <br /> forecast model, computerized roadway networks from the existing Raleigh <br /> and Durham traffic models were merged and the traffic analysis zones for <br /> the Triangle study area were redrafted. <br /> ▪ Regional Bus Service Start-up <br /> On August 23, 1992, Chapel Hill Transit under contract with the Triangle <br /> Transit Authority, added service on the Blue Line from Chapel Hill to <br /> Durham and initiated service on the Green Line from Chapel Hill to South <br /> Durham and Research Triangle Park. On April 19, 1993, the TTA <br /> initiated three routes serving Raleigh, Cary, Durham, RDU and RTP. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.