Browse
Search
Agenda - 11-01-1993 - VII-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 11-01-1993
>
Agenda - 11-01-1993 - VII-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2017 3:09:07 PM
Creation date
2/14/2017 2:05:39 PM
Metadata
Fields
Template:
BOCC
Date
11/1/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VII-A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Complete Regional Travel Forecast Sketch Model <br /> Along with Phase II of the Triangle Fixed Guideway Study, the Regional Travel <br /> Forecast Sketch Model will be completed. This model be the forerunner of a <br /> more detailed regional travel forecast model. <br /> • Complete Travel Behavior Survey <br /> To assist in forecasting trip generation rates and mode choice, TTA, in conjunction <br /> with the metropolitan planning organizations, will conduct a person trip and stated <br /> preference survey of Triangle area travelers. Data generated by this study will <br /> replace travel behavior surveys completed by NCDOT in the 1950's and 60's. <br /> • Replace Ridesharing Information Signs <br /> The Triangle's roadside ridesharing information signs will receive a face lift <br /> during the year. The cooperative project with the North Carolina Department of <br /> Transportation will replace roadside signs placed in the early 1980's. <br /> • New Rideshare Computer System <br /> TTA plans to develop a new interactive rideshare computer system permitting <br /> Triangle residents to access the regional carpool data base through personnel <br /> computers and kiosks at major activists centers. The project, proposed to be <br /> funded through the Federal Highway Administration's Congestion Management <br /> and Air Quality (CMAQ) program, is budgeted to cost $165,000. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.