Orange County NC Website
2.6.4 The Arch,tcct shall be a representative of and shall advise quantity of the Work, (2) reviewed construction.means, meth- <br /> and consult w:'') the Owner(I)during construction until final ods, techniques, sequences or procedures,(3)reviewe._copies <br /> payment R) tin Contractor is clue, and (2)as an Additional Ser- of requisitions received from Subcontractors anti material sup- <br /> yice at the 0v-Tier's direction from time to time during the cor- pliers and other data requested by the Owner to substantiate <br /> rection period described in the Contract for Construction. The the Contractor's right to payment or(4)ascertained how or for <br /> Architect shall bav authority to act on behalf of the Owner what purpose the Contractor has used money previously paid - <br /> only to the extent provided in thtc Agreement unless otherwise on account of the Contract Sum, <br /> modified by written instrument <br /> .2.6.11 The Architect shall have authority to reject Work which <br /> 2.6.5 The Architect shall visit the site at intervals appropriate does not conform to the Contract Documents. Whenever the <br /> to the stage of construction or as otherwise agreed by the Architect considers it necessary or advisable for implcmenta- <br /> Owner and Architect in writing to become generally familiar Lion of the intent of the Contract Documents,the Architect will <br /> with the progress and quality of the Work completed and to have authority to require additional inspection or testing of the <br /> determine in general if the Work is being performed in a man- Work in accordance with the provisions pf the Contract Docu- <br /> ner indicating that the Work when completed will he in accor- ments, whether or not such Work is fabricated, installed or <br /> dance with the Contract Documents. However, the Architect completed.However,neither this authority of the Architect nor <br /> shall not be required to make exhaustive or continuous on-site a decision made in good faith either to exercise or not to exer- <br /> inspections to check the quality or quantity of the Work. On cise such authority shall give rise to a duty or responsibility of <br /> the basis of on-site observations as an architect, the Architect the Architect to the Contractor, Subcontractors, material and <br /> shall keep the Owner informed of the progress and quality of equipment suppliers, their agents or employees or other per- <br /> the Work, and shall endeavor to guard the Owner against sons performing portions of the Won:. <br /> defects and deficiencies in the Work. (;1/ore ex!ensit'e site <br /> representation may be agreed to as an Additional Service. as 2.6.12 The Architect shall review and approve or take other <br /> described in Paragraph 3.2) appropriate action upon Contractor's submittals such as Shop <br /> -. Drawings, Product Data and Samples, but-only for the limited <br /> 2.6.6 The Architect shall not have control over or charge of purpose of checking for conformance with information given <br /> and shall not be responsible for construction means,methods, and the design concept expressed in the Contract Documents. <br /> techniques, sequences or procedures, or for safety precautions The Architect's action shall be taken with such reasonable <br /> and programs in connection with the Work, since these are promptness as to cause no delay in the Work or in the con- <br /> solely the Contractor's responsibility under the Contract for struction of the Owner or of separate contractors, while allow- <br /> Construction. The Architect shall not be responsible for the ing sufficient time in the Architect's professional judgment to <br /> Contractor's schedules or failure to carry out the Work it accor- permit adequate review. Review of such submittals is not con- <br /> dance with the Contract Documents, The Architecr -hall not ducted for the purpose of determining the:accuracy and com- <br /> pleteness control over or charge of acts or omissions of lira Contrite- <br /> tor, of other derails such as dimensions and quantities or <br /> tor, Subcontractors, or their agents or employees, or of any for substantiating instructions for installation or performance of <br /> other persons performing, portions of the Work. equipment or system:. ,iesigned by the Contractor,all of which <br /> remain the responsibility of the Contractor to the extent <br /> 2.6.7 The Architect shall a: all times have access to the Work required by the Contract Documents. The Architect's review <br /> wherever it is in preparati:ul or progress. shall not constitute approval of safety precautions or, unless <br /> otherwise specifically stated by the Architect, of construction <br /> 2.6.8 Except as may otherwise be provided in the Contract - means, methods, techniques, sequences Or procedures. The <br /> Documents or when direct communications have been spe- Architect's approval of a specific item-'_shall not indicate <br /> dally authorized, the Owner and Contractor shall communicate approval of an assembly of which the item is a component. <br /> through the Architect. Communications by and with the Archi- \C'hen professional certification of performance characteristics <br /> tect's consultants shall be through the Architect. of materials, systems or equipment is required by the Contract <br /> Documents, the Architect shall he entitled to rely upon such <br /> 2.6.9 Based on the Architect's observations and evaluations of certification to establish that the materials, systems or equip- <br /> the Contractor's Applications for Payment, the Architect shall menu will meet the performance criteria required by the Con- <br /> review and certify the amounts due the Contractor. tract Documents. <br /> 2.6.10 The Architect's certification for payment shall consti- . 2.6.13 The Architect shall prepare Change Orders and Con- <br /> tutu a representation to the Owner, based on the Architect's struction Change Directives, with supporting documentation <br /> observations at the site as provided in Subparagraph 2.6.S and - and data if deemed necessary by the Architect as provided in <br /> on the data comprising the Contractor's Application for Pay- Subparagraphs 3.1.1 and 3.3.3, for the Owner's approval and <br /> ment, that, to the best of the Architect's knowledge, informa- executior in accordance with the Contract Documents, and <br /> don and belief, the Work has progressed to the point indicated may authorize minor changes in the Work not involving an <br /> and the quality of VI>rit is in accordance with the Contract adjustment in the Contract Sum or an extension of the Contract <br /> Documents. The foregoing representations are subject to an Time which are not inconsistent with the intent of the Contract <br /> evaluation of the Work for conformance with the Contract Documents. <br /> Documents upon Substantial Completion, to results of subse- <br /> quent tests and inspections, to minor deviations from the Con- 2.6.14 The Architect shall conduct inspections to determine <br /> tract Documents correctable prior to completion and to spe- the date or dates of Substantial Completion and the date of final <br /> cific qualifications expressed by the Architect.The issuance of a completion, shall receive and forward to the Owner for the <br /> Certificate for Payment shall further constitute a representation Owner's review and records written warranties and related <br /> that the Contractor is entitled to payment in the amount certi- documents required by the Contract Documents and assem- <br /> fled- !lwever, the issuance of a Certificate for Payment shall bled by the Contractor,and shall issue a final Certificate for Pay- <br /> not he a representation that the Architect has(I) made exhaus- ment upon compliance with the requirements of the Contract <br /> toe or continuum on-site inspections to check the quality or Documents. <br /> AIA DOCUMENT 8141 • OWNER-ARCHITECT AGREEMENT• FOURTEENTH EDITION • AJAt • ©1987 <br /> 3 8141-1987 Tits AMERICAN INsTrrrTE OF ARC EIITECTS, 1735 NEW YORK AVENUE,N.W.,WASHINGTON,U.C.2n006 <br /> WARNING:Unlicensed phr>tncopyinq violates U.S.coovriahi laws anri is subject to leosl nrncPriitinn <br />